Reported | 06/20/2019 12:00 AM |
Project Title | Bulkhead Rehabilitation at the East Jetty Within the Raymond L. Flynn Marine Park |
Physical Address | View project details and contacts |
City, State (County) | Boston, MA 02201 (Suffolk County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dock/Pier/Marine |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The scope of work generally consists of: Repair and stabilization of approximately 465 linear feet of steel sheet pile bulkhead; Demolition of existing site bollards, bases; removal of utility poles, utility boxes and abandoned crane rails; Excavation of soil on the inshore side of the bulkhead to a depth of approximately 18 feet below grade and stockpile on-site for reuse; Placement of concrete (via tremie or another acceptable method) over crushed stone inside toe of sheet pile at low tide waterline; Construction of a reinforced concrete footing and 465-foot concrete wall inboard of sheet pile. The following two alternative methods of wall construction are described in construction drawings and specifications and will be permitted: 1) concrete cast-in-place, or 2) the use of precast concrete structural units; Backfilling of the new retaining wall with stockpiled excavate soil and new gravel fill; Installation of four (4) new mooring bollards with steel rods and concrete deadmen; Paving of all excavated areas and Installation of fencing and gates. | ||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |