Similar Projects
Nelson Property Group Residential
New Construction - 7,400 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Rock Hill, SC

Spencer's Trail
New Construction
Design
Anderson, SC

Access Road - Phase 2
Infrastructure
Bidding
$600,000 est. value
Ridgeville, SC

Culvert Repair Under Ball Field At Century Park
Infrastructure
Bidding
$40,000 est. value
Greer, SC 29650

RCRC Site Work Friarsgate
Term Contract
Post-Bid
SC 29063

Murray and Towers Drainage Improvements
Post-Bid
Anderson, SC 29624

Savannah Harbor DMCA 1N Dike Raising
Results
$1,000,000 to $5,000,000 est. value
Port Wentworth, Savannah, GA

USDA-FS Francis Marion & Sumter FSR 643, 644, 644A EROSION REPAIRS
Results
$100,000,000 to $250,000 est. value
Edgefield, SC 29824

Culvert Installation and Road Paving at Century Park
Infrastructure
Bidding
$40,000 est. value
Greer, SC 29650

Danbury Drive Drainage Improvements
Post-Bid
SC

Conway WWTP Erosion Control Project
Results
Conway, SC 29526

Beattie Plant Sewer Extension
Infrastructure
Bidding
$300,000 est. value
Fountain Inn, SC 29644

Fretwell Street Drainage Improvements
Post-Bid
North Charleston, SC 29406

Enhancement - East/West Path (Anderson Co)
Results
SC

Thomas Island Regional Pump Station And Interceptor
Post-Bid
SC

Last Updated 06/08/2022 11:43 PM
Project Title

Fairfield County Commerce Center Parcels 8 and 9

Physical Address View project details and contacts
City, State (County) Ridgeway, SC   (Fairfield County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $330,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site development for a future industrial site to include mass grading, storm drain installation, detention pond, erosion control including bank stabilization, and permanent grassing. All cut/fill will balance within the subject parcel to be developed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents