Similar Projects
Texas Department of Motor Vehicles (DMV) Camp Hubbard Campus Buildings 5
Renovation, Demolition - 375,000 SF
Conception
Austin, TX 78731

Vertical Construction Multiple Award Task Order Contract - Service Disabled Veteran Owned
New Construction
Design
$2,500 to $102,100,000 est. value

Vertical Construction Multiple Award Task Order Contract - Hubzone Set-Aside
New Construction, Renovation, Demolition
Design
$2,500 to $114,600,000 est. value

USCG National Multiple Award Construction Contract (NMACC III)
New Construction, Renovation, Addition
Bidding
$1,500,000 est. value

Palmer Events Center Plumbing and Restroom Upgrade
Renovation - 132,770 SF
Bidding
$2,800,000 est. value
Austin, TX 78704

Multiple Award Indefinite-Delivery Indefinite-Quantity (IDIQ) Task Order Contract For Construction, Repair, And Alteration With Design-Build And Incidental Abatement For Gsa/Pbs Region 7
Renovation
Post-Bid
$2,000 to $3,500,000 est. value

Secure Construction SATOC
Post-Bid
$100,000,000 est. value
Washington, DC

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Results
$3,000,000 to $15,000,000,000 est. value

D/B Southeast MATOC - Phase 2
Results
$1,000,000 to $170,000,000 est. value

South Llano River State Park - HQ Building Renovation and Expansion
Renovation, Addition
Construction
Austin, TX 78744

Public Health Capital Rehabilitation - APH Campus Building C
Renovation
Pending Verification
$546,000 est. value
Austin, TX

Seminole Canyon State Historical Site - Headquarters Repairs
Renovation
Pending Verification
Austin, TX 78744

Vertical Construction Multiple Award Task Order Contract - Women Owned Small Business Set-Aside
New Construction, Renovation, Demolition
Design
$2,500 to $116,300,000 est. value

Operations Center Upgrade
Renovation
Bidding
$120,000 est. value
Austin, TX

Facilities Management, Operations, Maintenance and Repair Services
Post-Bid
Austin, Del Valle, Georgetown, Hutto, Manor, New Braunfels, Pflugerville, Round Rock, TX

Reported 06/24/2022 12:00 AM
Project Title

Deferred Maintenance at DSHS 4 Building Project

Physical Address View project details and contacts
City, State (County) Austin, TX 78751   (Travis County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids. Construction Management - CM at Risk.
Project Status Request for Proposals (RFPs), Construction Start Expected February 2023
Bids Due View project details and contacts
Estimated Value $3,300,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Construction Manager-at-Risk (CMR) to complete multiple floor renovations in the Tower Building, F Building and provide code compliant egress from Tower west courtyard. The project plans to add by upcoming addenda, cleanup of the "Old Lab A100" Building and remove as much ACM's as allotted budget can provide. The project installed new power busduct in new stacked Electrical Closets and created new stacked IT closets. This CMR will complete remaining renovations on the Tower Building's 2nd, 4th, 5th and 7th floors, F Building and provide code compliant egress from Tower west courtyard. The project plans to add via addenda cleanup of the "Old Lab A100" Building and remove as much Asbestos Containing Materials (ACMs) as allotted budget can provide. General DM renovations call for the removal of hazardous materials found under the corridor floor and above the ceilings in insulation and mastic around ductwork and Variable Air Valve (VAV) boxes. The DM renovations concentrate on bringing the corridors into code compliance and replacing the VAV boxes and controls on each floor. DM renovations in F Building address the office and restroom areas only and exclude the Cafe. Abatement, VAV replacement and work above occupied office areas will need to take place after hours or scheduled weekends unless approved by DSHS.

Details

Misc. Buildings, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents