Similar Projects
Renovate Basement to Support Unit Stationing (Ventilation)
Alteration
Bidding
Less than $100,000 est. value
Urbana, IL 61802

Maintain and Service All Intelligent Transportation System Equipment Located in the Department's Districts 2 and 3
Alteration
Bidding

Building Automation System Replacement
Post-Bid
Westmont, IL 60559

Police Department UPS Replacement
Post-Bid
Northbrook, IL 60062

Central Boiler Facility and Electrical Updates
Results
$12,083,000 to $14,627,000 est. value
Hanover Park, IL 60133

Central Boiler Facility and Electrical Updates
Results
$12,083,000 to $14,627,000 est. value
Hanover Park, IL 60133

Denning School HVAC Replacement
Renovation, Alteration - 3,469 SF
Bidding
$2,000,000 est. value
West Frankfort, IL 62896

Lisle Police Department Exhuast Fan Replacement
Post-Bid
Lisle, IL

Middle Fork River Forest Preserve Activity Center HVAC Replacement
Results
Less than $65,000 est. value
Penfield, IL

Lead Service Replacement - Contract 1
Infrastructure, Alteration
Bidding
Aurora, IL

Boiler Demolition at West Aurora High School
Post-Bid
Aurora, IL 60506

Central Dietary - Temperature Controls
Renovation
Results
Less than $100,000 est. value
Elgin, IL 60123

Replacement of Luther Student Center Chiller #2
Alteration
Bidding
$471,000 est. value
Mattoon, IL 61938

2021 Electrical Equipment Upgrades at Geneva High School
Post-Bid
Geneva, IL 60134

Meehan Elementary School
Renovation, Addition
Results
Belvidere, IL 61008

Last Updated 04/21/2022 03:38 PM
Project Title

Century School HVAC Replacement

Physical Address View project details and contacts
City, State (County) Ullin, IL 62992   (Pulaski County)
Category(s) Education, Single Trades
Sub-Category(s) Electric, Elementary School, HVAC, Mechanical, Plumbing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work to covered by Base Bid shall include the demolition of existing 2x4 ACT ceiling, lighting fixtures, cutting of new masonry wall penetrations for new ductwork, hydronic piping, and ceiling mounted mechanical system in the areas shown in the Construction Documents. New work includes the installation of a new 2x2 ACT ceilings, LED light fixtures, roof mounted DOAS unit, roof mounted condensing units, VRF ceiling mounted units, EPDM roof patching, structural reinforcing, new gypsum soffit, new gas piping, and interior and exterior painting. Corresponding Structural, Mechanical, Electrical, and Plumbing Systems will also be included. Work covered by the Alternate Bid #1 shall include the same scope as the Base Bid but in additional areas as shown in the Construction Documents. Corresponding Mechanical, Electrical, and Plumbing Systems will also be included. Work covered by the Alternate Bid #2 shall include the same scope as the Base Bid but in additional areas as shown in the Construction Documents. Corresponding Mechanical, Electrical, and Plumbing Systems will also be included.

Details

Division 01 - General Requirements.
Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents