Similar Projects
Water and Wastewater Facilities Painting Services
Alteration
Post-Bid
Vista, CA 92084

Job Order Contract - Painting Contractor
Term Contract
Post-Bid
CA

Exterior Painting at Knob Hill Elementary
Alteration
Results
$100,000 est. value
San Marcos, CA 92069

Exterior Paint Project (MBMS)
Renovation
Results
$134,000 CJ est. value
Poway, CA 92064

As Needed Painting Services
Term Contract
Post-Bid
San Diego, CA

Stucco and Paint Project GRES
Renovation
Results
$90,000 CJ est. value
Poway, CA 92064

District Painting Project, Area 4 Schools
Renovation
Post-Bid
$200,000 CJ est. value
La Mesa, CA 91942

Castle Park High School Exterior Painting Project
Renovation, Infrastructure
Results
$937,400 CJ est. value
Chula Vista, CA 91911

Districtwide Painting Project, Area 1, 2, and 3 Middle Schools
Renovation
Post-Bid
$80,000 CJ est. value
La Mesa, CA 91942

Interior Painting Project
Renovation
Results
$354,300 CJ est. value
Chula Vista, CA 91910

Mission Hills High School Exterior Painting
Renovation
Post-Bid
$500,000 CJ est. value
San Marcos, CA 92069

Exterior Painting at Dana Middle School and Dewey Elementary School
Renovation
Results
$621,900 CJ est. value
San Diego, CA 92101

Woodland Park Middle School Exterior Painting
Renovation
Post-Bid
$500,000 CJ est. value
San Marcos, CA 92069

SB Minor B - Construct Rumble Strips - San Diego
Infrastructure
Post-Bid
$61,200 CJ est. value
San Diego, CA 92101

Polyester Concrete Overlay, Methacrylate, and Joint Seals
Infrastructure
Post-Bid
$3,280,000 CJ est. value
San Diego, CA 92101

Last Updated 09/15/2023 06:04 PM
Project Title

City Hall Painting and Wood Repairs

Physical Address View project details and contacts
City, State (County) Santee, CA 92071   (San Diego County)
Category(s) Single Trades
Sub-Category(s) Painting
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $228,350 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of September 6, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** Work includes the furnishing of all labor, materials, tools, equipment, and incidentals necessary for the wood repairs, sanding, cleaning, preparation, priming, installation of new building signage, exterior painting of 8 buildings and signage, painting of courtyard verandah, painting of hand railing, painting of parking lot light poles, painting of post indicator valve (PIV) and fire department connection (FDC), painting of flagpole metal base, and all related and necessary work as defined in the contract documents (the Project). Contractor License: California Classification A or C-33 (required at time of bid submission). Contract Working Days: 60 Working Days Any questions relating to this project should be directed to Antonio Sandoval at (619) 258-4100 ext. 179, or via email at ASandovalcityofsanteecasiov. Each bidder must submit a bid to the City Clerk on standard forms available in the Office of the Director of Engineering. Said bid is to be accompanied by a certified or cashiers check, cash deposit, or a bidders bond made payable to the City of Santee, in an amount not less than 10 percent (10%) of the total bid submitted Engineers Estimate: $ 330,000.00

Details

Division 09 - Finishes, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents