Similar Projects
“Francis Street Lift Station & Force Main
Renovation
Bidding
Kalamazoo, MI

Septage Forcemain Valve Station Project
New Construction
Bidding
$5,000,000 est. value
Smiths Creek, MI 48074

Replacement Of Submersible Pumps At 4 Lift Stations -Alpena Combat Training Center
Renovation
Post-Bid
Alpena, MI

Pump Station Replacement
Post-Bid
Oscoda, MI

Harvey Booster Station Pump 2 Rebuild
Results
Muskegon, MI 49442

Ida Pump Station Rehabilitation
Results
Ida, MI

Brye Road Booster Station Improvements
New Construction
Post-Bid
Ludington, MI

Dort Pump Station Rehabilitation
Results
Flint, MI

35th Street Pump Station Improvements
Renovation
Post-Bid
Comstock, MI

Bar Screen Upgrades St Louis Correctional Facility
Results
Saint Louis, MI 48880

Pump Station Modernization
Renovation
Post-Bid
Saline, MI

Gage Drain Pump Station Equipment
Results
Saginaw, MI

Biddle Point Pump Station Improvements
Renovation
Post-Bid
$2,750,000 est. value
Mackinac Island, MI

Hofma Park Pump Station Improvements
Results
Grand Haven, MI 49417

Sewer II System Improvements, Pump Stations
Renovation
Post-Bid
Flint, MI

Last Updated 05/02/2022 06:35 AM
Project Title

CWSRF-Hidden Lane, Meyers, Major Pump Station Improvements

Physical Address View project details and contacts
City, State (County) Clarkston, MI   (Oakland County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: The Project, of which the Work under the Contract Documents is a part, is generally described as follows: the abandonment and replacement of preexisting injector style sewer pumps, demolition of exiting operation equipment, abandonment and conversion of the confined space entries to wet wells, installation of submersible pumps, and construction of valve vaults at Hidden Lane Pump Station, Meyers Pump Station, and Major Pump Station

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents