Similar Projects
NED Ship Single Family Housing Repair for 604 Edgecliff Drive
Renovation
Bidding
$30,000 est. value
Pensacola, FL 32506

Residential Home - Home Plan - Bb-2095
New Construction
Post-Bid
Pensacola, FL

Weatherization Assistance Program
Renovation
Post-Bid

Oleta River State Park - PSS Residence Replacements
New Construction
Results

NED SHIP Single Family Housing Repair for 7924 Oak Forest Drive
Results
Pensacola, FL 32514

Redfish Harbor
New Construction - 159,896 SF
Construction
Pensacola, FL 32500

2021 Home CHDO Homeownership Infill Project
New Construction
Results
Pensacola, FL

NED SHIP Single Family Housing Repair for Patricia and James Miller
Renovation
Results
Pensacola, FL 32505

NED SHIP Single Family Housing Repair for 3061 Woodbury Circle
Renovation
Results
Cantonment, FL 32533

NED SHIP Single Family Housing Repair for 505 Salem Drive
Renovation
Results
Pensacola, FL 32514

NED Ship Single Family Housing Repair for 5513 Essex Circle
Renovation
Results
Pensacola, FL 32506

NED Ship Septic System Repair for 3202 West La Rua Street
Renovation
Results
Pensacola, FL 32505

NED SHIP Septic System Repair for 14621 Mullet Lane
Renovation
Results
Pensacola, FL 32507

NED SHIP Septic System Repair for 6364 Wyndotte Road
Renovation
Results
Pensacola, FL 32526

NED Ship Single Family Housing Repair for 1261 Fort Smith Circle
Renovation
Results
Pensacola, FL 32505

Last Updated 05/25/2022 02:55 AM
Project Title

NED CDBG Lead Based Paint Abatement Project for 115 SE Kalash Road

Physical Address View project details and contacts
City, State (County) Pensacola, FL 32507   (Escambia County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The general scope of work includes the proper encapsulation of LBP coated surfaces; removal of LBP coated components and the proper disposal of all waste generated from the project. The specific work to be performed includes: 1. Remove and Properly Dispose of the Interior White Wood Window Stools and Aprons from the kitchen and the front bedroom. 2. Remove and Properly Dispose of the White Wood Window Assembly and White Ceramic Tile Window Stool from the bathroom. 3. Encapsulate the Exterior White Wood Windowsills and Frames. 4. Encapsulate the Exterior White Wood Frieze, Soffit, Fascia, Rafter Tails and Gable End Walls.

Details

Single-Family Homes, Renovation.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents