Project Title | RFQ D/B - Cooling Tower Replacement |
Physical Address | View project details and contacts |
City, State (County) | Los Angeles, CA 90013 (Los Angeles County) |
Category(s) | Government/Public |
Sub-Category(s) | Misc. Buildings |
Contracting Method | Competitive Bids |
Project Status | Request for Qualifications, Construction start expected August 2023 , Construction documents |
Bids Due | View project details and contacts |
Estimated Value | $10,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Sol No: 300NLACoolingTower-PresolicitationNotice The contract is anticipated to involve the following work to be done at the federal building at 300 N. Los Angeles St., Los Angeles, CA: The overall strategic project goal of the Design-Build (DB) Contractor is for the replacement of (4) 2 Cell Cooling Towers and to perform structural sub-platform and main platform repairs and/or replacement within an occupied building without disruption to occupants and to utilize sustainable design and construction strategies where applicable and practical. Phase 1 Cooling Tower 1 and/or 2: Using the government provided Pre-Alteration Survey, provide an abatement work plan for review and approval and perform hazmat abatement work according to the findings and the approved plan. Furnish and set-up (1) 500 Ton temporary skid mounted Cooling Tower adjacent to the building on Los Angeles St. within a lockable chain link fence enclosure affording adequate NEC and service clearances, and pipe temporary bypass CWS/R lines to POCs in the basement. Provide temporary make-up water (MUW) and drain down piping indirectly to the nearest approved sanitary sewer. Provide temporary electrical power via a 200 KVA skid mounted genset and electrical disconnect and service power to the skid mounted Cooling Tower. Provide biocidal and other chemical treatment as needed for a temporary cooling tower. Obtain necessary permits and special inspections if/as required from the City of Los Angeles Public Works. Disconnect controls from CT-1 and/or 2, demolish condensate drain, make-up water lines and electrical service back to the distribution panel. Partially demolish Condenser water supply and return lines. Using a helicopter crane or other crane, demolish and remove CT-1 and/or 2 and remove from site to contractor chosen location for recycling and disposal. Demolish and replace CT-1 and/or 2 structural subframe(s). Fabricate off-site or assemble on site, replacement subframe support steel frames, prep and apply corrosion resistant paint or apply elastomeric coating with minimum 10-year warranty. Replace excessively corroded members, or repair CT main structural framing, removing all existing finish down to bare metal. Prepare and apply corrosion resistant paint or apply elastomeric coating with minimum 10-year warranty. Verify or correct capacity of existing mainframe and supporting roof beams, for gravity and lateral loads relative to weight of new CT's and axillary equipment. Provide special inspections of Class 1 weld fit-up and testing and AWS inspection of the welded connections and inspect existing bolted connections to ensure soundness. Evaluate structural capacity and attachments of catwalks and pipe support for possible reuse. Install engineered vibration isolators and seismic bracing for CT-1 and/or 2 and lift and install new CT(s) directly onto sub-framing. Repair pitch pockets and roofing as required in the work area. Provide new power from distribution panel to new electrical disconnect and whip and connect to tower(s) and CW pump(s). Install new MUW lines and drain down lines and route to existing indirect sanitary roof drain for each tower. Reconnect BAS controls, functional test and Cx controls for pumps, CT(s) and BAS via endpoint-to-endpoint testing and verification. Phase 2 Cooling Tower 3 and/or 4: Replace the (2) existing nominal 900-ton Cooling Towers (CTs) in one or two phases of construction. Using the government provided Pre-Alteration Survey, provide an abatement work plan for review and approval and perform hazmat abatement work according to the findings and the approved plan. Disconnect controls from CT-3 and/or -4, demolish condensate drain, make-up water lines and electrical service back to the distribution panel. Partially demolish Condenser water supply and return lines. Using a helicopter crane or other crane, demolish and remove CT-3 and/or -4 and their respective CW pumps and remove from site to contractor chosen location for recycling and disposal. Demolish and replace CT-3 and/or -4 structural subframe(s). Fabricate off-site or assemble on site, replacement subframe support steel frames, prep and apply corrosion resistant paint or apply elastomeric coating with minimum 10-year warranty. Replace excessively corroded members, or repair CT main structural framing, removing all existing finish down to bare metal. Prepare and apply corrosion resistant paint or an elastomeric coating with minimum 10-year warranty. Verify or correct capacity of existing mainframe and supporting roof beams, for gravity and lateral loads relative to weight of new CT's and axillary equipment. Provide special inspections of Class 1 weld fit-up and testing and AWS inspection of the welded connections and inspect existing bolted connections to ensure soundness. Evaluate structural capacity and attachments of catwalks and pipe support for possible reuse. Install engineered vibration isolators and seismic bracing for CT-3 and/or -4 and lift and install new CT(s) directly onto sub-framing. Repair pitch pockets and roofing as required in the work area. Provide new power from distribution panel to new electrical disconnect and whip and connect to tower(s) and CW pump(s). Install new MUW lines and drain down lines and route to existing indirect sanitary roof drain for each tower. Reconnect BAS controls, functional test and Cx controls for pumps, CT(s) and BAS via endpoint-to- endpoint testing and verification. (Note: There is no BAS programming nor graphics scope) The anticipated magnitude of the contract is $5M to $10M. A full and open request for proposal is anticipated to be published late February or early March 2023. The method of contractor selection has not been determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |