Similar Projects
Murphy USA #6608 / Stillwater
Demolition, New Construction, Infrastructure - 1,400 SF
Conception
$1,500,000 CJ est. value
Stillwater, OK 74074

Grade, Drain, and Surface - US 177
Infrastructure
Design
$5,088,000 CJ est. value
Stillwater, OK 74074

Utilities - SH 51
Infrastructure
Design
$1,000,000 CJ est. value
Stillwater, OK 74074

OSU New Central Market Place - Select Trades Rebid
New Construction, Infrastructure
Sub-Bidding
$15,000,000 CJ est. value
Stillwater, OK 74074

Asphalt Overlay
Infrastructure
Post-Bid
$2,679,278 CJ est. value
Stillwater, OK 74074

South Thompson Avenue, Culvert Replacement Over Cottonwood Creek
Infrastructure
Post-Bid
$300,000 CJ est. value
Cushing, OK 74023

Overlay of a Area With 2 Manhole Rings to Bring the Manholes Level With the Street
Infrastructure
Results
$40,900 CJ est. value
Glencoe, OK 74032

Widen and Resurface - SH 18
Infrastructure
Results
$9,642,525 CJ est. value
Cushing, OK 74023

Teal Ridge Estates Second Section
New Construction, Infrastructure
Pending Verification
$13,000,000 CJ est. value
Stillwater, OK 74074

Utilities - SH 18
Infrastructure
Design
$500,000 CJ est. value
Yale, OK 74085

Club Car Wash / Stillwater
New Construction, Infrastructure - 5,671 SF
Post-Bid
$1,300,000 CJ est. value
Stillwater, OK 74075

Pavement Rehabilitation (Asphalt) - SH-108
Infrastructure
Results
$1,098,187 CJ est. value
Glencoe, OK 74032

Widen and Resurface - SH 51
Infrastructure
Design
$17,510,000 CJ est. value
Stillwater, OK 74074

McElroy Road Pavement Repair
Infrastructure
Post-Bid
$2,174,442 CJ est. value
Stillwater, OK 74078

Widen and Resurface - SH 51
Infrastructure
Design
$13,390,000 CJ est. value
Stillwater, OK 74074

Last Updated 01/20/2023 03:45 PM
Project Title

Sac and Fox Nation Cushing Industrial Building

Physical Address View project details and contacts
City, State (County) Cushing, OK 74023   (Payne County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $305,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

All Bidders shall provide a Bid Bond in the amount of Five Per Cent (5%) of their respective Bid for this Project. Non-Consideration of Bids: Bids received after the time set for delivery of bids will not be considered and will be returned unopened. It is the Owner's intent, upon receipt of an acceptable bid, that the contract will be awarded Within forty-five (45) days after opening of bids and the written contract executed within ten (10) days thereafter. The executed contract will not be returned until after receipt of the bonds and insurance, and the several completed certification documents found in the bidding documents. Complete sets of the Drawings, Specifications and other bidding documents may be procured by prime bidders at the Sac and Fox Nation Property & Procurement Department. A cashier's check, certified check or surety bond in the amount of five percent (5%) of the bid shall accompany the sealed proposal of each bidder. Checks or surety bonds will be returned to unsuccessful bidders. Prior to execution of the Contract, the Bidder to whom the Contract is awarded will be required to furnish bonds as follows: 1. Statutory Bond - 100% of Contract Amount 2. Performance Bond - 100% of Contract Amount 3. One Year Defect Bond - 100% of Contract Amount By submitting a bid, Bidders agree and promise to comply with the applicable Federal laws and regulations, including: 1. Davis Bacon Act, 40 U.S.C. 276 a US Department of Labor Regulations (29 CFR Part 3) (prevailing wage rate), 2. providing the prevailing wage rate in the bid proposal, and 3. providing certified payroll as a condition of payment 4. providing evidence that all material men and suppliers have been paid and all claims have been released. The Sac and Fox Nation reserves the right to waive any irregularities or informalities and to reject any or all proposals. Indian Preference provided. The project is not sales-tax exempt. Contact Vickie Benham, Property & Procurement Director at 918-968-3526 ext. 1020 or vbenham@sacandfoxnation-nsn.gov for additional questions.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents