Similar Projects
2020-2025 Community Potable Water Treatment
Term Contract
Post-Bid

2020-2025 Community Potable Water Treatment
Term Contract
Post-Bid

S--Pest Control Services (VA-18-00131445)
Results
Albany, NY 12208

Porta John Units and Services at Camp Smith Training Site Cortlandt Manor NY
Results
Cortlandt Manor, NY 10567

Niagara BOS FY21
Post-Bid
Niagara Falls, NY 14304

Rental and Service of Porta Jons, Handwash Stations and Grey Water Container/Removal
Results
Watertown, NY 13201

Water Treatment Services
Term Contract
Post-Bid
Pomona, NY 10970

Water Treatment Service
Term Contract
Results
Buffalo, NY 14203

Emerald Ash Borer Treatment
Term Contract
Post-Bid
Syracuse, NY 13202

Pest Control Services
Term Contract
Post-Bid
Syracuse, NY 13202

W085--Riverfront Portable Toilets (Va-20-00052949)
Term Contract
Post-Bid
Montrose, NY 10548

Rent Various Types of Portable Toilets as Needed in Various City Parks
Term Contract
Post-Bid
Yonkers, NY 10701

Hazardous Material Testing, Design And Project Monitoring Services
Renovation
Post-Bid
NY

General Contractor Services
Term Contract
Post-Bid
Rochester, NY 14609

Pest Control
Term Contract
Post-Bid
Rochester, NY 14609

Last Updated 10/14/2021 03:43 PM
Project Title

Facilities Master Plan

Physical Address View project details and contacts
City, State (County) Massena, NY   (Saint Lawrence County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Facilities Master Plan for ongoing and future SLSDC facilities use needs. The Facilities Master Plan shall have an organized structure for documenting the analysis and recommendations for the existing and future facility use needs: - Evaluate facilities to gain an in-depth knowledge of current and future needs. - Analyze future needs for 5, 10 and 20-year time periods. - Identify deficiencies in existing facilities including current physical conditions and space utilization. - Recommend appropriate modifications to existing facilities and/or construction of new facilities to meet future needs. - For each existing facility, regardless if there is a recommendation to modify it, complete a survey of the condition of the facility and future major renovation and maintenance requirements. - Use Federal sustainability design guidelines to identify potential energy conservation improvements for existing, modified or new facilities. - Develop associated preliminary costs and schedules for the above items for implementation planning purposes.

Details

Division 01 - General Requirements, Facility Operation, Facility Operation Procedures, Facility Maintenance.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents