Similar Projects
Last Updated | 08/25/2020 12:02 AM |
Project Title | Porch Rehab of Heritage Park Buildings |
Physical Address | View project details and contacts |
City, State (County) | Taylor, MI (Wayne County) |
Category(s) | Single Trades |
Sub-Category(s) | Finishes/Exterior |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Train Car Porch 1.22'x10' plus steps to code. 2.All decking, railing and fascia boards will be commercial grade composite material. 3.Permits required and inspections at no charge to the vendor. 4.Wood sub-frame 5.Steps build to code all composite deck, railing and any other areas that are not sub frame. 6.3'x3' plus steps to code. 7.All decking, railing and fascia boards will be commercial grade composite material. 8.Permits required and inspections at no charge to the vendor. 9.Wood sub-frame 11.Steps build to code all composite deck, railing and any other areas that are not sub frame. Church Porch 1.Remove old deck boards, railing system and fascia board 2.Replace any damaged or rotted sub-frame add additional decking support/cross bracing if needed to ensure no sag when the new deck is installed. 3.Install commercial grade composite decking color options needed, Install commercial grade composite railing system and commercial grade composite fascia board. 4.Steps to be installed as they are now all commercial grade composite deck/railing system. 5.We want it to look classic and a manner that fits the time period not modern. We will discuss options with potential bidders. 6.Working area must be kept clean and secure Town Hall 1.Replace 2 porches south porch needs to be handicap both porches must be composite material vinyl railing. School House 2.Replace both porches composite material and vinyl railing. Taylor Historical Museum 1.East Porch Remove decking, reuse structure and add if needed. Re-deck with composite. Train Station 1.Repair or replace pouch with composite material. 2.Replace railing with composite or vinyl 3.For all jobs all material and debris will be disposed of by contractor. Permits must be pulled. No charge for the permits and inspections |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |