Similar Projects
South Commercial Avenue Corridor Plan - Phase II Commercial Avenue from 14th to 34th - City of Anacortes
Infrastructure
Conception
$60,000,000 CJ est. value
Anacortes, WA 98221

Fidalgo Bay Road Reconstruction - City of Anacortes
Infrastructure
Conception
$9,500,000 CJ est. value
Anacortes, WA 98221

I-5 / Maddox Creek - Fish Passage
Infrastructure
Design
$15,457,000 CJ est. value
Mount Vernon, WA 98273

The Crossings Cottages Development
New Construction, Infrastructure
Design
$800,000 CJ est. value
Anacortes, WA 98221

Waste Water Treatment Plant Outfall Relocation Upland Phase
New Construction
Post-Bid
Anacortes, WA 98221

Darrington Wood Innovation Center
Infrastructure
Post-Bid
$9,650,000 est. value
Darrington, WA

Tower Site Readiness Phase III Project
Infrastructure
Results
Arlington, Bothell, Darrington, Everett, Monroe, WA 98241

WWTP Textile Pod Repair and Improvements
Renovation
Results
$350,000 to $430,000 est. value
Sedro-Woolley, WA

Tommy Thompson Trestle and Causeway Replacement - City of Anacortes
Infrastructure
Construction
$350,000 CJ est. value
Anacortes, WA 98221

R Avenue Safety and Mobility Improvements - City of Anacortes
Infrastructure
Conception
$5,427,164 CJ est. value
Anacortes, WA 98221

SR 530/Sauk River Roadway Embankment - Stabilization Top
Infrastructure
Design
$5,055,000 CJ est. value
Concrete, WA 98237

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Little Mountain Sky Ridge Road Pipeline Project
Infrastructure
Results
$982,504 CJ est. value
Mount Vernon, WA 98274

17th Street Q Avenue Intersection - City of Anacortes
Infrastructure
Conception
$2,000,000 CJ est. value
Anacortes, WA 98221

Samish Early Learning Center
New Construction, Infrastructure - 4,530 SF
Design
$2,500,000 CJ est. value
Anacortes, WA 98221

Last Updated 03/10/2023 09:37 AM
Project Title

Former Water Treatment Plant Demolition

Physical Address View project details and contacts
City, State (County) Anacortes, WA 98221   (Skagit County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This Project generally consists of demolition of inactive Water Treatment Plant (WTP) buildings and structures including the following: Demolition of the former administration/pump room building, including structures coated with polychlorinated biphenyl (PCB) bulk product waste. Demolition of portions of the former filtration basin, clear well, and sedimentation basin that contain PCBs or are coated with PCB bulk product waste. Excavation and removal of PCB-impacted soils. Processing clean concrete debris for onsite reuse. Backfill of clearwell structure and portions of the sedimentation basin. Grading and restoration. Transportation and offsite disposal of all soils and wastes, including but not limited to PCB-impacted soils and PCB bulk product waste. The Work will be done adjacent to an operating WTP which must remain in continuous operation with no disturbance throughout construction. A bid deposit equal to 5% of the bid amount is required.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents