Similar Projects
CMGC Services for Construction of a New Pump Facility
Infrastructure
Bidding
Dillon, CO

2022 Planned Rehabilitation of Denver Basin Aquifer Wells
Infrastructure
Bidding
Castle Rock, CO

Arapahoe Aquifer Well Drilling Project
Post-Bid
Monument, CO 80132

2021 Planned Well Rehabilitation and Well Abandonment / Denver Basin Aquifer Wells
Post-Bid
Castle Rock, CO

Repair by Replacing Domestic Water Pumps B420
Results
$1,000,000 to $5,000,000 est. value
Colorado Springs, CO

BLM-CO-NWD - CRV FO - Greenhorn Water Well
Results
Gypsum, CO

Non-Potable Pond Pump Station
Construction
Brighton, CO 80601

Ritoro Operations Building and Wells A-2 and D-2 Project
New Construction, Infrastructure
Construction
$2,100,000 est. value
Elizabeth, CO 80107

Avon Drinking Water Facility Chemical Feed Upgrades
Post-Bid
Vail, CO

Denver Well Pump
Results
$100,000 to $120,000 est. value
CO

Rueter-Hess Well House Modifications Progressive
Post-Bid
Parker, CO 80134

Well A-15 Rehabilitation Project
Results
Less than $141,750 est. value
Aurora, CO 80016

Co-Monte Vista NWR-Monte Vista Wells
Post-Bid
Monte Vista, CO

Oil and Sand Tank Pumping
Results
Denver, CO 80204

PWSD Well Equipment Replacement Project
Post-Bid
Parker, CO

Last Updated 02/03/2022 05:49 PM
Project Title

North Campus Well Field Expansion, Former Thornton Property - Civil/Elec/Mech

Physical Address View project details and contacts
City, State (County) Aurora, CO   (Adams County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Notice of Invitation for Bids only addresses the project’s second construction contract (buildout of the new well’s associated civil/electrical/mechanical infrastructure and their integration into the existing Well Field). Under this contract a prequalified prime (general) contractor (prequalified under SOQ-21-5835A) will be retained by the City (through competitive bid) to construct the civil/electrical/mechanical infrastructure designed for the new groundwater production wells and commission the new production wells.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents