Similar Projects
Stevens Point - Wausau, CTH X - Marathon County Line, NB
Infrastructure
Bidding
$4,000,000 est. value
WI

Chip Sealing Roads
Post-Bid
Stevens Point, WI

Granite - Base Coarse -Seal Coating
Infrastructure
Post-Bid
Stevens Point, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Pavement Milling and Reclaiming
Infrastructure
Post-Bid
WI

C Wautoma, S Cambridge Street, STH 22 S to STH 22 N. Princeton - Plainfield, STH 22 S to CTH BB
Results
Plainfield, Princeton, Wautoma, WI 54982

2022 Street Improvement Project
Infrastructure
Post-Bid
Stevens Point, WI 54481

Village of Plover, Post Road, Springville Drive - Tommy's Turnpike, Village of Plover, Post Road, Springville Drive - Tommy's Turnpike
Results
Plover, WI 54467

2022 Reconstruction of Strange Street
Infrastructure
Post-Bid
Whiting, WI 54481

2021 Bituminous Patching
Results
Stevens Point, WI

Bituminous Oil
Term Contract
Post-Bid
WI

Pavement Milling and Reclaiming
Results
Stevens Point, WI

2022 Pavement Maintenance Program
Infrastructure
Post-Bid
Stevens Point, WI

2021 Street Improvement
Results
Stevens Point, WI 54481

Last Updated 05/20/2022 07:04 AM
Project Title

Plainfield - Stevens Point, Waushara Co. Line - Birch Drive, SB

Physical Address View project details and contacts
City, State (County) Plover, WI 54467 (Portage, Waushara Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,000,000 to $6,999,999
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Excavation Common, 6,559 CY; Base Aggregate Dense, 11,229 Ton; Marking Epoxy, 167,147 LF; Construction Staking, 80,591 LF; Construction Staking, 1 LS; Beam Guard, 3,320 LF; Beam Guard Energy Absorbing Terminals, 10 Each; Asphaltic Surface, 341 Ton; HMA Pavement, 52,949 Ton; Removing Asphaltic Surface Milling, 264,075 SY; Tack Coat, 33,655 Gals.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Roadway Construction, Vehicle Barriers, Vehicle Guide Rails.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents