Similar Projects
Mill Town Mixed Use
New Construction
Conception
Chattanooga, TN

RFQ Engineering - Annexation Area Water Main Phase II
Infrastructure
Conception
$700,000 CJ est. value
Germantown, TN 38138

Saddle Grove Residential Development
New Construction
Design
Smyrna, TN 37167

SR-29 (US-27) North of Ray Cross Road/Mossy Grove Road to SR-62 - 1765011 - Tennessee Department of Transportation (TDOT)
Alteration
Design
$56,783,093 est. value
Harriman, TN 37748

Water System Improvements for 2022 Greene County Water Infrastructure Grant Program Newport Highway And Garrett Hill Road - Phase One
Infrastructure
Bidding
$500,000 CJ est. value
Greeneville, TN 37743

East Ridge Street Improvements
Infrastructure
Bidding
$700,000 CJ est. value
East Ridge, TN 37412

Landscaping City Buildings
Infrastructure
Sub-Bidding
$30,000 CJ est. value
Charlotte, TN 37036

HVAC Renovations at New Tazewell (TN12-008) and Tazewell (TN12-009)
Renovation
Sub-Bidding
$815,000 CJ est. value
Tazewell, TN 37879

RS-2 Asphalt and Fog Seal
Term Contract
Post-Bid
Ripley, TN

Habitat For Humanity
New Construction, Renovation
Post-Bid
Chattanooga, TN 37403

FY 2021 Asphalt Paving, South Section
Results
Memphis, TN 38103

Road Resurfacing on S.R. 69
Results
TN 38242

West Street Shoulder Improvements
Infrastructure
Construction
Rossville, TN

Bear Creek Glen Townhomes
New Construction
Pending Verification
Columbia, TN 38401

Woods Crossing Phase 1
New Construction
Pending Verification
Gallatin, TN 37066

Last Updated 08/05/2022 02:15 AM
Project Title

Roofing and Miscellaneous Repairs at Developments - TN058-001, -002, -003, -004, and -005

Physical Address View project details and contacts
City, State (County) Greeneville, TN 37743   (Greene County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Single-Family Homes, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $345,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

No. TN43PO5850120 The project generally consists of, but is not limited to, the following work: 1. Re-roof the office with standing seam metal roof. 2. Remove the existing gutters and downspouts, repair all rotted fascia, re-wrap with metal, and re-install gutters in all developments. 3. Interior work includes: painting of ceilings as identified on the Drawings. 4. Repair the brick on the back and ends of 4 buildings, approx.a 2'x 3' hole. 5. Remodel a total of 16 bathrooms in the two-story buildings in development TN058-003, consisting of, remove and replace tub and surround, install new shower valves, remove old cast plumbing, and install new PVC waste drain. 6. Replace the roof at Dev TN058-005 with new metal roof, as specified, down to the plywood sheathing. This includes several layers of roofing. 7. Remove and Re-pour 2 sidewalks, totaling approx. 75'. 8. Removal of approx. 18 trees. 9. Remove and replace 4-inch water lines, totaling approx. 1,100 ft. All bidders must be licensed Contractors as required by the Contractors Licensing Act of 1994 (TCA Title 62, Chapter 6) of the General Assembly of the State of Tennessee. No bid will be opened unless the outside of the sealed envelope containing the bid provides the following information: the Contractor's name, license number, the date of the license's expiration, and a quotation of that part of his classification applying to the bid. In the case of joint ventures, this information must be provided by each party submitting the bid. All subcontracts relating to roofing, plumbing, mechanical, electrical, HVAC and geothermal that exceed $25,000.00, or masonry contracts (materials and labor) that exceeds $100,000, require the general contractor to list the subcontractor and their respective state license number on the outside of the Bid Envelope. If the subcontract does not exceed $25,000.00 for the above-mentioned categories or $100,000 for masonry work, the general contractor must certify to this effect, in writing, on the outside of the Bid Envelope. Each prime bidder must deposit with his bid security in the amount of 5 percent of the bid. Bid Bonds and Performance and Payment Bonds must be secured by a guaranty or a surety company listed in the latest issue of U.S. Treasury Circular 570 and shall be within the maximum amount specified for such company in said Circular 570. The "Bid Bond" and the "Performance and Payment Bond" must be issued by a surety company authorized to do business in the state where the project is located, and must be listed in U.S. Treasury Circular No. 570. Attention is called to the fact that no less than the minimum salaries and wages set forth in the Contract Documents must be paid on this project. The Contract will be subject to the "Section 3" Clause, see Document 00 72 00, Page 15, calling for utilization of low-income businesses and individuals from the project area where feasible. Bidders must comply with the President's Executive Order Nos. 11246 and 11375, which prohibit discrimination in employment regarding race, creed, color, sex, or national origin. Bidders must comply with Title VI of the Civil Rights Act of 1964, the Anti-Kickback Act, and the Contract Work Hour Standard Act. Bidders must certify that they do not, and will not, maintain or provide for their employees any facilities that are segregated on a basis of race, color, creed, sex, or national origin. Attention is called to the goals and timetables for minority and female participation. The right is reserved to reject any or all bids or to waive any informalities in the bidding. No bidder may withdraw his bid within 60 days after the actual date of the opening thereof. Estimated construction cost is between $330,000.00 and $345,00.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. MBE (12%), WBE (6.9%) Total contract time will be 180 calendar days

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents