Similar Projects
Shake Shack / Des Peres
New Construction, Infrastructure - 3,453 SF
Design
$1,000,000 CJ est. value
Des Peres, MO 63131

Logan University Fuhr Science Center
Addition, Demolition, Renovation, Infrastructure - 14,400 SF
Design
$28,000,000 CJ est. value
Chesterfield, MO 63017

Fee Fee Road (Westport Plaza Drive to Schuetz Road)
New Construction, Infrastructure
Bidding
$1,452,746 CJ est. value
Maryland Heights, MO 63043

Fee Fee Road (Westport Plaza Drive to Schuetz Road)
New Construction, Infrastructure
Bidding
$1,452,746 CJ est. value
Maryland Heights, MO 63043

2022 and 2023 Citywide Sidewalk
Post-Bid
$969,502 est. value
Saint Louis, MO

Installation of a Walking Track
Infrastructure
Post-Bid
Overland, MO

Spanish Pond ADA Improvements
New Construction
Results
MO 63138

Repave Streetscape at Justice Center
Results
Ballwin, MO 63011

Louisiana Calm Street
Infrastructure
Post-Bid
$108,487,725 est. value
Saint Louis, MO

2020 CRS Pavement Rehabilitation
Infrastructure
Results
MO

On-Call Roadway Maintenance
Term Contract
Post-Bid
Town and Country, MO

University Drive , Grobman Road and North Campus West Drive Paving
Infrastructure
Results
Saint Louis, MO

Florissant Road Improvements
Infrastructure
Post-Bid
Ferguson, MO 63135

Asphalt Repairs
Infrastructure - 9,212 SF
Results
Clayton, MO

Frost Avenue Improvements
Infrastructure
Post-Bid
Ferguson, MO 63135

Last Updated 01/24/2023 07:32 AM
Project Title

Deruntz Avenue - City of Maryland Heights

Physical Address View project details and contacts
City, State (County) Maryland Heights, MO 63043   (Saint Louis County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2026
Bids Due View project details and contacts
Estimated Value $2,350,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will consist of removing the asphalt pavement and replacing with concrete pavement. This project will include new sidewalks on both sides of the existing road. A cul-de-sac will be constructed on the end of the current avenue. Storm drainage improvements will be incorporated as part of the project. As of January 24, 2023, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2026. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2026. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents