Last Updated | 07/22/2022 02:35 PM |
Project Title | ARPA Concrete |
Physical Address | View project details and contacts |
City, State (County) | Colorado Springs, CO 80903 (El Paso County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $200,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work to be done by the Contractor shall consist of removal and replacement of sidewalks, street cross pans, pedestrian ramps, curb and gutter, curb returns, bubblers, patterned concrete, drainage structures, and asphalt patch paving. This work shall include restoration of all areas disturbed by the construction activities to a condition better than the pre-construction condition, and the protection or replacement of all fencing, retaining walls, landscaping, removal of obstructions, minor utility relocation and/or adjustment, grading, soil scarification, moisture control, backfill & compaction and plantings. This work shall also include the disposal of all surplus or waste materials and provide all traffic control/barricading required for this work. Cold weather protection shall be incidental to unit prices of work items to be performed and not paid for separately. Question Acceptance Deadline 06/22/2022 04:00 PM EDT Questions are submitted online Yes Piggyback Contract No Addendum amount: 1 General Requirements - Insurance Required |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |