Similar Projects
Last Updated | 03/14/2022 02:45 AM |
Project Title | Horicon - Kewaskum, STH 67/175/TW Intersection |
Physical Address | View project details and contacts |
City, State (County) | WI (Dodge County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Excavation, Base, HMA Pavement, Curb and Gutter, Sidewalk, Signs, Pavement Marking, Culvert Pipes, Storm Sewer, and Street Lighting. Excavation Common, 24,705 CY; Base Aggregate Dense, 15,650 Ton; Select Crushed Material, 14,550 Ton; Marking Epoxy, 18,238 LF; Construction Staking, 27,665 LF; Construction Staking, 23 Each; Construction Staking, 2 LS; Conduit, 2,520 LF; Culvert Pipe, 255 LF 18”, 134 LF 24“, 91 LF 30“; Storm Sewer Pipe, 86 LF 12“, 164 LF 15“, 165 LF 24“, 63 LF 15“; Concrete Curb and Gutter, 4,826 LF; Concrete Sidewalk, 16,180 SF; HMA Pavement, 5,613 Ton; Tack Coat, 836 Gals; Signs, 742 SF; Poles Type 5-Aluminum, 16 Each. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |