Similar Projects
Huntsville Northern Bypass - City of Huntsville
Renovation
Conception
$53,000,000 CJ est. value
Huntsville, AL 35801

Clinton Avenue Improvements - City Of Huntsville
Infrastructure
Conception
$2,500,000 CJ est. value
Huntsville, AL 35801

Margaritaville Hotel / Madison
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Madison, AL 35758

Balch Road Widening 15-021 - City of Madison
Infrastructure
Design
$1,681,304 CJ est. value
Madison, AL 35758

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Transit Transfer Station
New Construction, Infrastructure
Post-Bid
$15,677,228 CJ est. value
Huntsville, AL 35801

Constructing the Safety Improvements (Shoulder Widening, Guardrail Installation, Pavement Markers, and Traffic Stripe) on Dug Hill Road from a Point 1500 Feet North of the Junction of King Drake Road to the Junction of Raintree Road in Huntsville
Infrastructure
Results
$92,950 to $113,606 est. value
Brownsboro, Huntsville, AL 35741

Constructing the Planing, Resurfacing, and Traffic Stripe on I-565 from 0.260 mile East of the Triana Boulevard Overpass (MP 18.332) to 0.450 mile east of the SR-2 (US-72) Interchange (MP 22.305) in Huntsville
Infrastructure
Results
$4,571,037 to $5,586,823 est. value
AL

Circle K - Road Improvements and Convenience Store
New Construction, Alteration - 5,533 SF
Construction
Huntsville, AL 35810

Carillon Oaks Madison
Demolition, New Construction, Infrastructure - 35,195 SF
Construction
$9,500,000 CJ est. value
Madison, AL 35758

Paxton Place Apartments
New Construction, Infrastructure
Pending Verification
$125,000,000 CJ est. value
Madison, AL 35758

Everstead Residential Development
New Construction, Infrastructure
Pending Verification
$11,000,000 CJ est. value
Madison, AL 35758

Eastern Bypass - City Of Huntsville
Infrastructure
Conception
$10,600,000 CJ est. value
Huntsville, AL 35763

Rocket Development Phase 1
New Construction, Infrastructure - 90,000 SF
Design
$190,000,000 CJ est. value
Huntsville, AL 35801

Kroger U-606 / Madison
Demolition, Infrastructure, Build-out, Renovation - 89,892 SF
Post-Bid
$2,500,000 CJ est. value
Madison, AL 35758

Last Updated 08/07/2023 09:55 PM
Project Title

Constructing the Roadway Improvements (Turn Lane Additions and Traffic Signal Improvements) on Sr-53 at Harvest Road

Physical Address View project details and contacts
City, State (County) Harvest, AL 35749   (Madison County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $3,812,743 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Madison County Contract Time: 200 Working Days For constructing the Roadway Improvements (Turn Lane Additions and Traffic Signal Improvements) on SR-53 at Harvest Road in Harvest (Site 1) and on SR-53 from the intersection of McKee Road to the intersection of Old Railroad Bed Road (Site 2). Length 1.020 mi. The Bracket Estimate on this project is from $3,119,296 to $3,812,743 . If further clarification is needed, please contact the Plans and Proposal Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 027 - Constructing the Roadway Improvements (Turn Lane Additions and Traffic Signal Improvements) on Sr-53 at Harvest Road *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents