Similar Projects
2022 Capital Improvements Bond Projects - City of Little Rock
New Construction, Infrastructure
Conception
$161,800,000 CJ est. value
Little Rock, AR 72201

Contractor - John L. McClellan (JLM) Memorial Veterans Hospital | RAD Room Site Prep, Room 10
Renovation, Infrastructure
Design
$25,000 to $100,000 est. value
Little Rock, AR 72205

JP Wright Loop Rd. Rail Grade Separation (S)
Infrastructure
Bidding
$15,000,000 CJ est. value
Jacksonville, AR 72076

Wilson Water Treatment Plant Pavement Repair 2022
Infrastructure
Bidding
$80,000 CJ est. value
Little Rock, AR 72212

Wellington Hills Apartments
New Construction, Infrastructure - 56,482 SF
Sub-Bidding
$85,000,000 CJ est. value
Little Rock, AR 72201

Sherwood Public Works Site Development Phase 2
Infrastructure
Post-Bid
Sherwood, AR

Faulkner Lake Clarifier Launder Cover Project
Renovation
Post-Bid
North Little Rock, AR

Fourche Creek Water Reclamation Facility Fog Receiving Station and Digester Upgrades
Renovation
Results
Little Rock, AR 72206

LIT Vortac Relocation Access Drive and Site Grading (Harris Road)
Infrastructure
Results
Little Rock, AR 72223

Taxiway Charlie Reconstruction Program - Phase 2
Infrastructure
Construction
$70,754,110 CJ est. value
Little Rock, AR 72202

Quapaw Subdivision - Master Plan
New Construction
Pending Verification
North Little Rock, AR

Maverick Addition
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
North Little Rock, AR 72117

Little Rock Afb Civil Works
Term Contract
Post-Bid
$79,000,000 est. value
Jacksonville, AR 72078

Demolition and Site Clearance of 8 Locations
Demolition, Infrastructure
Results
North Little Rock, AR 72114

The Woodlands of Sherwood
New Construction, Infrastructure
Pending Verification
$21,000,000 CJ est. value
Sherwood, AR 72120

Last Updated 09/29/2022 06:02 PM
Project Title

Johnson Wastewater Treatment Plant Improvements

Physical Address View project details and contacts
City, State (County) Jacksonville, AR 72076   (Pulaski County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Johnson Wastewater Treatment Plant Improvements - Jacksonville Wastewater Utility

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents