Similar Projects
16" Water Main - Signal Butte Road, Pecos Road to Germann
Bidding
$1,400,000 to $1,600,000 est. value
Mesa, AZ 85213

Festival Ranch Planning Area 2 Kerry Lane Infrastructure Water Line and Offsite Water Line
Bidding
Buckeye, AZ

Kyrene Middle School Underground Piping Replacement
Term Contract
Post-Bid
$3,200,000 est. value
Tempe, AZ 85284

Professional Services for Loop 101 and Loop 202 Freeway Waterline and Sewer Rehabilitation
Post-Bid
Chandler, AZ 85225

The Grid Mixed Use Project Site Improvements CMAR
Renovation
Results
$2,500,000 to $4,500,000 est. value
Mesa, AZ 85201

Construction of a Water and Sewer Line
Results
Less than $332,464 est. value
Tolleson, AZ 85353

Professional Services for Water Main Replacements
Bidding
$5,000,000 est. value
Chandler, AZ

Professional Services For Loop 101 And 202 Freeway Waterline And Sewer Rehabilitation City
Post-Bid
Chandler, AZ

Water Meters
Results
Glendale, AZ 85301

Professional Services for Water Main Replacements 2019 - Westwood Manor, Kingston and Chieftain Village
Bidding
Chandler, AZ

Loop 101 & 202 Freeway Waterline and Sewer Rehabilitation
Post-Bid
Chandler, AZ 85225

Job Order Contracting Services For Sewer Main And Manholes
Results
Chandler, AZ

Water Main Replacements
Bidding
$1,000,000 to $5,500,000 est. value
Chandler, AZ

Cotton Lane RV Resort Off Site Water Plans
Post-Bid
Goodyear, AZ 85338

Airport Drive Water Line
Results
$142,734 to $261,969 est. value
Queen Creek, AZ 85142

Last Updated 09/02/2020 10:36 AM
Project Title

Alto and Palm Water Main Replacement

Physical Address View project details and contacts
City, State (County) El Mirage, AZ 85335   (Maricopa County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of existing water mains within Downtown El Mirage. The primary project Base Bid item work will consist of the installation of approximately 2,600 linear feet of 6-inch C900 DR18 CL235 PVC water main; installation of 69 new 1” Municipex water service lines with new meter boxes, valves, and fittings; removal and replacement of street pavement sections; and construction of other related appurtenances and items of work within an existing Public Utility Easement between Alto Street and Palm Street from Thunderbird Road to End Street. Additional work includes, but is not limited to, the removal and replacement of curb and sidewalk, abandonment of existing water lines after the new water main has been placed in service, valve frame and cover adjustments, traffic control, mobilization and site restoration.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents