Similar Projects
Last Updated | 09/02/2020 10:36 AM |
Project Title | Alto and Palm Water Main Replacement |
Physical Address | View project details and contacts |
City, State (County) | El Mirage, AZ 85335 (Maricopa County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Replacement of existing water mains within Downtown El Mirage. The primary project Base Bid item work will consist of the installation of approximately 2,600 linear feet of 6-inch C900 DR18 CL235 PVC water main; installation of 69 new 1” Municipex water service lines with new meter boxes, valves, and fittings; removal and replacement of street pavement sections; and construction of other related appurtenances and items of work within an existing Public Utility Easement between Alto Street and Palm Street from Thunderbird Road to End Street. Additional work includes, but is not limited to, the removal and replacement of curb and sidewalk, abandonment of existing water lines after the new water main has been placed in service, valve frame and cover adjustments, traffic control, mobilization and site restoration. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |