Similar Projects
UTMB - Emergency Room Building AHU Replacement
Post-Bid
Galveston, TX 77550

Comprehensive HVAC Solutions and Services - Part 1
Post-Bid
Pittsburg, TX 75686

Exhaust Ventilation System
Results
$25,000 to $100,000 est. value
El Paso, TX 79916

Annual Contract - Cooling Towers Cleaning Services
Term Contract
Results
San Antonio, TX

Texas A&M Dunn HVAC Replacement
Construction
College Station, TX 77840

Mold Removal and Remediation at Austin State Supported Living Center
Demolition
Post-Bid
Less than $382,328 est. value
Austin, TX 78756

Austin, TX ATCT DCD/HVAC Replacement
Results
$1,000,000 to $5,000,000 est. value
Austin, TX 78719

Split System Air Conditioning Units
Post-Bid
Huntsville, TX

Dedicated Outside Air Units
Results
$320,420 est. value
Mesquite, TX

Chiller Inspections and Repairs for Rusk State Hospital
Post-Bid
Rusk, TX 75785

Steam Units 2 and 3 Boiler Repair
Results
$549,000 est. value
Greenville, TX 75401

Multiple Campus RTU Replacements
Post-Bid
Mount Pleasant, TX 75455

Replace Two Chiller Circuites for a Building
Results
$250,000 to $500,000 est. value
Killeen, TX 76544

Red River Army Depot (RRAD) Utility Energy Services Contract
Post-Bid
New Boston, TX 75570

HVAC Refurbishing Fire Admin Building
Results
Irving, TX

Reported 02/26/2020 12:00 AM
Project Title

Construction Manager at Risk HVAC Equipment Change Out

Physical Address View project details and contacts
City, State (County) Hutto, TX 78634   (Williamson County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $3,000,000
Plans Available from Construction Manager as Contractor (CMc)
Owner View project details and contacts
Architect View project details and contacts
Description

Project A: Hutto Middle School Equipment Change Out 1. A complete Mechanical Equipment Change Out of air conditioning equipment including Outside Air Equipment. 2. A complete replacement of the DDC HVAC controls for the entire campus. 3. Exhaust fans will be review and replaced as needed. 4. Kitchen cooking fans will be excluded from the project. 5. Provide alternate for exterior Building and site lighting. The estimated construction cost is $1,800,000. Project B: Cottonwood Creek Elementary Equipment Change Out 1. A complete Mechanical Equipment Change Out of air conditioning equipment including Outside Air Equipment. 2. A complete replacement of the DDC HVAC controls for the entire campus. 3. Exhaust fans will be review and replaced as needed. 4. Kitchen cooking fans will be excluded from the project. 5. Provide alternate for exterior Building and site lighting. The estimated construction cost is $1,200,000

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents