Similar Projects
PRESS - Coalfields Expressway - West Virginia Department of Transportation
Infrastructure
Design
Mullens, WV 25882

PRESS - Coalfields Expressway - West Virginia Department of Transportation
Infrastructure
Design
Mullens, WV 25882

Rehabilitation-Restoration-Resurfacing - Hanover - Ikes Fork
Infrastructure
Bidding
$900,000 CJ est. value
Hanover, WV 24839

Rehabilitation-Restoration-Resurfacing - Hanover - Ikes Fork
Infrastructure
Bidding
$900,000 CJ est. value
Hanover, WV 24839

Paving
Infrastructure
Post-Bid
$624,000 CJ est. value
Pineville, WV 24874

Paving
Infrastructure
Post-Bid
$624,000 CJ est. value
Pineville, WV 24874

Highway Pollinator Mitigation Site Development and Maintenance
Term Contract, Infrastructure
Results

Bridge Expansion Joint Repair System Emseal 6622C008
Renovation, Infrastructure
Results

Structure Replacement
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Toney Fork, WV 24870

Bridge Expansion Joint Repair System Silspec 6622C019
Renovation, Infrastructure
Results

Montecarlo Complex
Infrastructure
Results
WV

Deep Injection Roadway Settlement Stabilization
Infrastructure
Results

2022 RPM
Infrastructure
Results

Const New/reloc 4 Lane Road W/bridge(S)
New Construction, Infrastructure
Results
$170,000,000 est. value
Wyoming, WV 24898

Last Updated 02/09/2023 07:39 AM
Project Title

Amigo Arch Br

Physical Address View project details and contacts
City, State (County) Itmann, WV 24847   (Wyoming County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected April 2025
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Federal Project Number : NHPP0016287D Type of Work : Repl As of February 09, 2023, the project is in Design status. The funding obligation date for the construction is January 28, 2025. WVDOT - Amigo Arch Br *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents