Similar Projects
Railroad Avenue – CDBG 2016 – Water and Sewer System Improvements
Post-Bid
Cochran, GA

Magnolia Drainage Improvements
Post-Bid
Less than $275,000 est. value
Tifton, GA

Tradeport East Rough Grading and Drainage Improvements
Results
Less than $563,843 est. value
GA

Mobley Park Storm Drainage Improvements
Results
Port Wentworth, GA

Storm Drainage Improvements FY2018 CDBG
Post-Bid
Irwinton, GA 31042

Kennesaw Avenue Sidewalk and Drainage Improvements
Results
$350,000 to $500,000 est. value
Nelson, GA

Replacement of the Streets and Drainage Improvements
Post-Bid
Jesup, GA 31545

Exit 18 Erosion Control and Welcome Sign Installation
Results
La Grange, GA 30240

36” CMP Rehabilitation
Post-Bid
GA

Cherry-Church-Blanchard-King Avenues Drainage Improvements
Results
Pine Mountain, GA

T32-D6-Drainage Rehab-Pickens-97322
Post-Bid
GA

Sequoia Circle Drainage Improvements Phase II
Results
Hinesville, GA 31310

Drainage Base and Pave Construction
Post-Bid
Lyons, GA 30436

Pooler Old Town Drainage - Project B
Results
Less than $811,700 est. value
Pooler, GA 31322

T32-D6-Drain Rehab-Chattooga-97769
Post-Bid
GA

Last Updated 11/12/2020 03:16 AM
Project Title

Mims Street Drainage Improvements

Physical Address View project details and contacts
City, State (County) Savannah, GA 31416   (Chatham County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project begins at the end of an existing storm drain pipe located in Beard Creek Lane and proceeds some 660 feet in a generally northerly direction to another existing storm drain pipe under Mims Street. The work consists of clearing and stripping the work areas as required to complete the work, installation of storm drain pipes and structures, and associated work as shown on the plans. Compliance with requirements of the NPDES Georgia general permit is not required. The work is located in undeveloped areas where it will not impact traffic.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents