Similar Projects
Parking Areas - EXPO FY22
Infrastructure
Bidding
$162,000 est. value
OH

Paving Improvement
Infrastructure
Bidding
Hilliard, OH 43026

Pedestrian Safety Improvements - Chantry Drive Sidewalk
Infrastructure
Post-Bid
Columbus, OH 43232

Cultural Arts Center Parking Lot Repair
Infrastructure
Post-Bid
Columbus, OH 43215

UIRF 2016 Sidewalks P2
Results
Less than $1,707,075 est. value
Columbus, OH

2020 Sidewalk Reconstruction Program & College Avenue Sidewalk Improvements
Results
$832,000 est. value
Westerville, OH

Grandview Heights Signals Interconnect
Results
Less than $1,156,318 est. value
Grandview Heights, OH 43212

Quarry Trails Overlook Deck and Parking Area
Results
Less than $400,000 est. value
Columbus, OH

Cemetery Road at Franklin Street Pedestrian Crossing
Results
Less than $65,000 est. value
Hilliard, OH 43026

Miscellaneous Developments- American Addition Infrastructure Phase 4
Results
Columbus, OH

Celebrate 1 Sidewalk - Hamilton Avenue
Results
Columbus, OH

Celebrate 1 Sidewalk - Hilltop Belvidere Mound to Sullivant
Results
Columbus, OH

Reflective Rapid Flashing Beacon
Results
Worthington, OH

Block L Infrastructure and South of Goodale Infrastructure Improvements
Results
Less than $10,054,235 est. value
Grandview Heights, OH

Comprehensive Wayfinding System Phase 2
Results
Less than $640,000 est. value
Dublin, OH

Reported 03/30/2022 04:34 PM
Project Title

Woodside Green Park Parking Lot Improvements

Physical Address View project details and contacts
City, State (County) Gahanna, OH 43230   (Franklin County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value $224,385
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project will consist of the removal and replacement of the existing hard surface and curbing and the addition of approximately 15 new parking spaces. The project will also include the excavation and installation of approximately 250 linear foot of 8 foot wide blacktop walking paths. It is anticipated that the work will commence on February, 2022 and be completed by March, 2022. Closure of Woodside Green Park to be coordinated with the owner and may alter start and completion dates.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents