Similar Projects
3rd Avenue North 9th to 11th Street Reconstruction - City of Great Falls
Infrastructure
Conception
$500,000 CJ est. value
Great Falls, MT 59404

3rd Avenue North 9th to 11th Street Reconstruction - City of Great Falls
Infrastructure
Conception
$500,000 CJ est. value
Great Falls, MT 59404

Mt Bighorn Warman Loop Road
Term Contract
Design
MT

Phase 1 Collection System Rehabilitation
Infrastructure
Design
$1,950,000 CJ est. value
Glendive, MT 59330

Broadwater County Fairgrounds Restrooms and Wastewater Improvements
Addition, Demolition, Renovation, Infrastructure
Bidding
$570,000 CJ est. value
Townsend, MT 59644

Broadwater County Fairgrounds Restrooms and Wastewater Improvements
Addition, Demolition, Renovation, Infrastructure
Bidding
$570,000 CJ est. value
Townsend, MT 59644

HRDC Community First Griffin Place Site and Infrastructure
Demolition, Infrastructure
Post-Bid

HRDC Community First Griffin Place Site and Infrastructure
Demolition, Infrastructure
Post-Bid

2011-00141 BIA Route #0073 Improvements - Phase III
Infrastructure
Results
MT

Hudson Bay Divide South
Infrastructure
Results

Rivers Edge Trail Connector Project - Montana Department of Transportation
New Construction, Infrastructure
Pending Verification
$2,800,000 CJ est. value
Great Falls, MT 59405

Rivers Edge Trail Connector Project - Montana Department of Transportation
New Construction, Infrastructure
Pending Verification
$2,800,000 CJ est. value
Great Falls, MT 59405

52nd Street North 7th to 10th Avenue North Reconstruction - City of Great Falls
Infrastructure
Conception
$600,000 CJ est. value
Great Falls, MT 59405

D/ B - Emergency Relief (ER) - Red Lodge Area Flood Repairs
Infrastructure
Design
$300,000 est. value
Red Lodge, MT 59068

Red Lodge Phase 1 Stormwater System Improvements
Infrastructure
Bidding
$650,000 CJ est. value
Red Lodge, MT 59068

Last Updated 09/26/2022 01:11 PM
Project Title

Slide Repair - N of Terry

Physical Address View project details and contacts
City, State (County) Terry, MT 59349   (Prairie County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $1,972,048 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of Sept 26 the project was awarded to MARTIN CONSTRUCTION INC for $1,972,047.92. Slide repair including slope flattening, compaction grout and drainage improvements on the Slide Repair - N of Terry project located on Secondary 253 in Prairie County. The project is located approximately a half mile north of the Yellowstone River, north of Terry from RP 1.2 to 1.3 and RP 1.8 to 1.9. This project is under the jurisdiction of the Glendive District Administrator. Uniform No. 9724000 MTDOT - 103 - Slide Repair - N of Terry

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents