Similar Projects
Wacker and Oakton Lift Station Upgrades
Renovation
Design
Savanna, IL

Canal Road Pump Stations No. 2 & No. 3 At Wood River Levee District
Renovation
Design
$1,000,000 to $5,000,000 est. value
Roxana, IL

Lawrence Avenue Lift Station Rehabilitation
Renovation
Bidding
$300,000 est. value
Joliet, IL 60435

Phase 3 Water Supply Improvement Project
New Construction
Bidding
$300,000 est. value
Quincy, IL

Low Lift Pump
Post-Bid
Winnetka, IL

Mount Prospect Golf Club Irrigation Pump Station Replacement
Post-Bid
Mount Prospect, IL 60056

Post 4 Lift Station Improvements
Results
Less than $533,904 est. value
Tinley Park, IL 60477

Pump Station Rehabilitation PY19
Results
Less than $60,000 est. value
Brooklyn, IL 62059

7th Avenue Pump Station
Construction
Less than $1,250,000 est. value
Mendota, IL 61342

North Island Lift Station Improvements
Renovation
Bidding
$400,000 est. value
Wilmington, IL

Check Valve Replacement
Renovation
Post-Bid
Gurnee, IL 60031

Six Shafts Infiltration Mitigation
Term Contract
Results
$1,874,000 to $2,269,000 est. value
Hodgkins, IL 60525

Centennial Beach Stormwater Lift Station Pumps and Controller Replacement
Renovation
Bidding
$200,000 est. value
Naperville, IL 60540

High Lift Pump 7 Replacement
Renovation
Post-Bid
Northbrook, IL

Lakeshore Drive Lift Station Replacement
Results
Decatur, IL 62521

Last Updated 05/09/2022 05:40 AM
Project Title

Village of Durand Wastewater Treatment Plant Main Lift Station Improvements

Physical Address View project details and contacts
City, State (County) Durand, IL 61024   (Winnebago County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of a new lift station/force main with new pumps to replace the existing main lift station at the Wastewater Treatment Plant. Convert the lagoon system from series to parallel and remove sludge from Lagoons 1 and 2.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents