Similar Projects
Last Updated | 01/06/2021 10:32 AM |
Project Title | Pumping Facility (East Plant) Improvements |
Physical Address | View project details and contacts |
City, State (County) | Brownsburg, IN (Hendricks County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Pumps and Wells |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Contractor shall furnish all labor, equipment, materials, and services to construct, install, test, start-up, and place into operation the East Plant Improvements including but not limited to, the following: 1. A New Mechanical Vortex Style Grit Tank with top mounted grit pumping unit housed in a prefabricated and heated enclosure. 2. Bar Rack and Access Hatch Hardware Replacement at the North and South CSO Swirl Concentrator units located on the plant site. 3. CSO Storage Tank Concrete/Stair Repairs 4. Building Structural Repairs; Architectural Upgrades 5. Safety Upgrades 6. SCADA Improvements 7. A new flow meter installed on the existing 18” force main discharging from the Plant. together with all related civil/site work, process mechanical, architectural, structural, HVAC, plumbing, electrical, instrumentation & control work as specified herein and shown on the Drawings |
||||||||||||
Details |
|
||||||||||||
Bidder's List | View project details and contacts | ||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |