Similar Projects
Sanitary Sewer Manhole Replacement
Infrastructure
Bidding
$12,500 est. value
Bluff City, TN 37618

Short Tail Springs Force Main Replacement and Pump Station Upgrade, Phase II
Renovation, Infrastructure
Bidding
Harrison, TN 37341

East Ridge Basin 1-75 Collector Sewer Project
Post-Bid
Chattanooga, TN 37402

Water and Sewer Line Replacement
Post-Bid
$180,000 to $220,000 est. value
Jellico, TN

Dobbs Branch Basin Improvements Phase 2
Results
Less than $9,598,525 est. value
Chattanooga, TN 37405

Amos Road Force Main Replacement
Results
Less than $834,825 est. value
Chattanooga, TN 37400

Sprinkler System
Renovation
Construction
Clarksville, TN 37040

Martin Sewer Rehabilitation Phase VI - CDBG - Bid Package B
Infrastructure
Bidding
Martin, TN

Lupton Drive Chronic SSO Elimination
Renovation
Post-Bid
Chattanooga, TN 37400

Manhole Components
Term Contract
Results
Less than $100,000 est. value
Chattanooga, TN

Chelsea Siphon Construction
Infrastructure
Bidding
Memphis, TN

Design/Build Services to Repair/Replace the Sanitary Sewer System at the Jacobs Civilian Conservation Center
Post-Bid
$500,000 to $1,000,000 est. value
Bristol, TN

East Ridge Sewer Basin 3C and 4B Rehabilitation
Results
Chattanooga, TN

Southern Force Main
Infrastructure
Bidding
White House, TN 37188

Upper Station Camp Creek Sewer Extension
Post-Bid
Gallatin, TN

Last Updated 10/14/2021 12:43 PM
Project Title

Steel Casing Pipe Under Highway 28

Physical Address View project details and contacts
City, State (County) Whitwell, TN 37397   (Marion County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the construction of approximately 240 L.F. of new 12” steel casing pipe from the western Right-of-way of Hwy 28 and under the roadway. The pipe will be located approximately 450 feet south-southwest from the intersection of Hwy 283 and Hwy 28. More specifically the project includes crossing under Hwy 28 by jack and bore from the western Right-of-way beginning 13 feet west of the Right-of-way limits and extending 240 feet and ending 37 feet from the existing edge of pavement of Hwy 28. Also included is installation and maintenance of erosion and sedimentation controls, compliance with applicable permit conditions, cleanup, final stabilization, and marking and capping of the casing pipe for future installation of a new 4” force main under a separate future project.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents