Similar Projects
Waste Plant Improvements / Youngstown
Infrastructure
Conception
$43,500,000 CJ est. value
Youngstown, OH 44503

Improvement of: 2022 Crack Sealing of Various Roads in Boardman Township
Infrastructure
Design
$270,000 CJ est. value
Boardman, OH 44512

Improvement of: 2022 Crack Sealing of Various Roads in Boardman Township
Infrastructure
Design
$270,000 CJ est. value
Boardman, OH 44512

2023 City-wide Street Resurfacing Program
Infrastructure
Bidding
$1,000,000 CJ est. value
Youngstown, OH 44503

2023 City-wide Street Resurfacing Program
Infrastructure
Bidding
$1,000,000 CJ est. value
Youngstown, OH 44503

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

2021 Road Resurfacing Program
Infrastructure
Post-Bid
$565,000 est. value
Austintown, OH

2022 Chip Seal Program
Infrastructure
Results
$93,904 est. value
North Lima, OH

2021 OPWC Road and Bridge Safety Upgrade Program
New Construction, Infrastructure
Results
$2,612,581 est. value
Boardman, OH

Fifth Avenue - City of Youngstown
New Construction, Infrastructure
Pending Verification
$26,000,000 CJ est. value
Youngstown, OH 44503

Fifth Avenue - City of Youngstown
New Construction, Infrastructure
Pending Verification
$26,000,000 CJ est. value
Youngstown, OH 44503

Roadway Minor Rehab - SR 170
Infrastructure
Design
$6,383,300 CJ est. value
New Middletown, OH 44442

Green Drive Improvements Austintown Township
Infrastructure
Post-Bid
$102,000 est. value
Austintown, OH 44515

Brungard Road Upgrades - Phase 2
Infrastructure
Results
$89,000 est. value
New Middletown, OH 44442

Glenwood Avenue Corridor - City of Youngstown
Infrastructure
Pending Verification
$500,000 CJ est. value
Youngstown, OH 44503

Last Updated 05/24/2023 08:37 AM
Project Title

2022 Road Resurfacing Project and Country Green Drive Pavement Project

Physical Address View project details and contacts
City, State (County) Austintown, OH 44515   (Mahoning County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $745,661 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The 2022 Road Resurfacing Project includes asphalt pavement resurfacing on 22 residential township streets located at various locations throughout Austintown Township. Total overall project length is 19,870 (3.76 miles). Average pavement width is 24 . The Country Green Drive Pavement Project includes improving the condition of the road with full depth removal and replacement of the existing asphalt pavement, curb, & gutter and installation of underdrains. Project length is approximately 150 . Pavement width is 20

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents