Similar Projects
Kihei Wastewater Pump Station No. 4 Modification/Upgrade - CBS-3199 - Maui County
Renovation
Conception
$2,200,000 CJ est. value
Kihei, HI 96753

Paia Wastewater Pump Station Modifications - CBS-3207 - Maui County
Renovation
Conception
$1,650,000 CJ est. value
Paia, HI 96779

Kihei WWPS No. 9 Modifications
Renovation, Infrastructure
Bidding
$3,000,000 CJ est. value
Kihei, HI 96753

Motor and Booster Pump Replacement
Renovation
Post-Bid
$800,000 CJ est. value
Kula, HI 96790

Wailea Booster #2 Pump And Motor Replacement
Renovation, Infrastructure
Post-Bid
$500,000 CJ est. value
Kula, HI 96790

Wailea Booster #2 Pump and Motor Replacement
Infrastructure
Results
$223,000 CJ est. value
Wailuku, HI 96793

Kanoa Well No. 1 Site - Motor Control Center and Electrical Upgrades
Renovation
Results
$251,789 CJ est. value
Wailuku, HI 96793

Waiehu Heights Well 1 Replacement - Exploratory
Infrastructure
Construction
$928,933 CJ est. value
Wailuku, HI 96793

Kihei Wastewater Pump Station No 7 Relocation - County Of Maui
Renovation
Pending Verification
$8,000,000 CJ est. value
Kihei, HI 96753

Waikapu/Wailuku Diversion Pump Station And Force Main - County of Maui
New Construction, Infrastructure
Pending Verification
$9,000,000 CJ est. value
Kula, HI 96790

Waiehu Kou Wastewater Pump Station Modifications - CBS-5526 - Maui County
Renovation
Conception
$2,200,000 CJ est. value
Wailuku, HI 96793

Keanae Well 2 Pump and Motor Replacement
Renovation
Post-Bid
$400,000 CJ est. value
Wailuku, HI 96793

Kihei Wastewater Pump Station 8 Modifications/Upgrade - County of Maui
Renovation
Pending Verification
$4,000,000 CJ est. value
Kula, HI 96790

Napili Wastewater Pump Station No. 2 Modifications - CBS-1178 - Maui County
Renovation
Conception
$4,000,000 CJ est. value
Napili-Honokowai, HI 96761

Kihei Wastewater Pump Station No. 6 Modifications/Upgrade - County of Maui
Renovation
Pending Verification
$6,800,000 CJ est. value
Kula, HI 96790

Last Updated 10/24/2022 03:03 PM
Project Title

Waihee Line BSTR-Replacement of Pumping Units

Physical Address View project details and contacts
City, State (County) Waihee-Waiehu, HI 96793   (Maui County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $9,414,222 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

PN_-21-006 Work in contaminated soil and install new vertical turbine booster pumps, motors, valves, piping, suction barrels, flow tube, gauge board, MCC, power and control wiring, conduits, steel platform, building improvements, temporary access gates, and all appurtenant work (EST. COST RANGE $4,000,000 TO $7,500,000) Start of Service Date: 08/02/2022 End of Service Date: 10/26/2023 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The scope of work identified in this section is the minimum required experience as it pertains to the contractor questionnaire in the Bid Solicitation. a. Installation of vertical turbine pumps and appurtenant work including motors, valves, piping, flow tube, and gauge board. b. Installation of MCC and appurtenant work including power and control wiring and conduits. c. Experience in working in contaminated soil and having previous completed required Construction Environmental Hazard Management Plans and Site Specific Health and Safety Plans for approval by the State of Hawaii Department of Health (including Closeout Reports); experience in compliance with all federal, state and county regulations related to work and handling of contaminated soil. This project consists of furnishing and paying for all labor, tools, materials and equipment necessary to work in contaminated soil and install new vertical turbine booster pumps, motors, valves, piping, suction barrels, flow tube, gauge board, MCC, power and control wiring, conduits, steel platform, building improvements, temporary access gates, and all appurtenant work at Waihee Line Booster, all in accordance with the plans and specifications, in place complete, ready for operation

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents