Project Title | Waihee Line BSTR-Replacement of Pumping Units |
Physical Address | View project details and contacts |
City, State (County) | Waihee-Waiehu, HI 96793 (Maui County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $9,414,222 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | PN_-21-006 Work in contaminated soil and install new vertical turbine booster pumps, motors, valves, piping, suction barrels, flow tube, gauge board, MCC, power and control wiring, conduits, steel platform, building improvements, temporary access gates, and all appurtenant work (EST. COST RANGE $4,000,000 TO $7,500,000) Start of Service Date: 08/02/2022 End of Service Date: 10/26/2023 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The scope of work identified in this section is the minimum required experience as it pertains to the contractor questionnaire in the Bid Solicitation. a. Installation of vertical turbine pumps and appurtenant work including motors, valves, piping, flow tube, and gauge board. b. Installation of MCC and appurtenant work including power and control wiring and conduits. c. Experience in working in contaminated soil and having previous completed required Construction Environmental Hazard Management Plans and Site Specific Health and Safety Plans for approval by the State of Hawaii Department of Health (including Closeout Reports); experience in compliance with all federal, state and county regulations related to work and handling of contaminated soil. This project consists of furnishing and paying for all labor, tools, materials and equipment necessary to work in contaminated soil and install new vertical turbine booster pumps, motors, valves, piping, suction barrels, flow tube, gauge board, MCC, power and control wiring, conduits, steel platform, building improvements, temporary access gates, and all appurtenant work at Waihee Line Booster, all in accordance with the plans and specifications, in place complete, ready for operation |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |