Similar Projects
The Settlement
New Construction
Conception
Simpsonville, SC

Changed Lives Ministry
New Construction - 9,200 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Moncks Corner, SC 29461

Johns Island Commerce & Medical Park - Phase 2 & 4
New Construction - 75,000 SF
Design
Johns Island, SC

815 South Main Hotel and Event Center
Renovation, Addition
Design
Greenville, SC

Cumberland Garage Elevator Modernization
New Construction
Bidding
Charleston, SC 29401

Holiday Inn Club Vacation Ocean Front
New Construction - 452,034 SF
Post-Bid
$10,000,000 CJ est. value
Myrtle Beach, SC

Freed Street Deck
New Construction
Post-Bid
Columbia, SC 29201

State Veterans' Nursing Home Construction - Northwest Region
New Construction - 148,000 SF
Results
$37,500,000 to $45,000,000 est. value
Gaffney, SC 29341

Design Build Parking Structure
Results
$30,000,000 to $40,000,000 est. value
Charleston, SC 29405

St. Joseph's/Candler Medical Campus - Phase 1
New Construction - 20,000 SF
Construction
$11,000,000 est. value
Bluffton, SC

SoBa at RedStone
New Construction - 1,221,460 SF
Construction
$10,000,000 CJ est. value
Indian Land, SC

Greenville Endoscopy Center
New Construction
Pending Verification
$3,400,000 est. value
Greenville, SC

Encompass Health Rehabilitation Hospital of Fort Mill
New Construction
Pending Verification
SC 29708

Myrtle Beach Treatment Specialists
New Construction - 4,845 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Myrtle Beach, SC

Pinestone
New Construction - 77,000 SF
Design
Travelers Rest, SC

Last Updated 06/15/2021 10:12 AM
Project Title

Sumter Behavioral Health Services

Physical Address View project details and contacts
City, State (County) Sumter, SC   (Sumter County)
Category(s) Heavy and Highway, Medical
Sub-Category(s) Medical Office/Outpatient, Nursing/Rehabilitation Center, Parking Garage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

NEW OUTPATIENT CLINIC AND ASSOCIATED PARKING

Details

1 Parking Garage, New Construction 123 Parking Spaces, 1 Medical Office/Outpatient, 2 Stories Above Grade, to 36,000 SF New Construction Building.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Wall Coverings, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Seating.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents