Similar Projects
UPRR Parking Lot
Post-Bid
Cibolo, TX

Constructing a Parking Lot Area
Post-Bid
Gainesville, TX 76240

New Sidewalk Construction
Results
$100,000 to $250,000 est. value
El Paso, TX 79906

Walnut Creek Elementary Pedestrian Walkway
Results
Azle, TX

Cade Branch Trail Project
Construction
Roanoke, TX

Northgrove Section 7 Sitework and Landscape
Post-Bid
TX

Parking Lot - Castroville Building
Results
Hondo, TX

Converse Sidewalk Project
Post-Bid
Less than $370,000 est. value
Converse, TX 78109

2019 Reclamation Reconstruction Task Order Contract Package 6
Results
San Antonio, TX 78205

Technology Bridge Side-Walk and Security Fence
Post-Bid
Houston, TX

General Civil Construction and Related Items, Precinct 3
Term Contract
Results
$1,500,000 est. value
Houston, TX

Curb Cutting
Term Contract
Post-Bid
San Marcos, TX

FY19 Winter Parking Lot Maintenance Project
Results
Houston, TX

Concrete Patching, Paving, and Curb Repair
Post-Bid
Lewisville, TX

Repair and Install Ramps
Results
Houston, TX

Reported 03/26/2019 01:00 PM
Project Title

Campus Sidewalk Project

Physical Address View project details and contacts
City, State (County) Gainesville, TX   (Cooke County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description 1. The work includes removal and replacement of damaged or broken sections of concrete walks around campus. Off-site removal of all concrete to be replaced will be required as part of this project. Additionally, widening of concrete roads and enlarging turning intersections at several locations on campus will be required at the Gainesville State School facility in Gainesville, Texas. 2. The existing concrete walks are in disrepair and do not meet accessibility standards. Match existing elevations such that smooth transitions from existing to new are installed. 3. Provide expansion joints between old and new and provide control joints a minimum of 5 on center.
Details
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents