Similar Projects
SCI(State Correctional Institution) Albion - Renovate Chilled Water Plant - Phase 1 - HVAC and Electrical Construction
Alteration
Bidding
$800,000 to $900,000 est. value
Albion, PA 16475

Perry Square Electric
Alteration
Bidding
$400,000 est. value
Erie, PA 16501

Lancaster Operations Fluid Distribution System Expansion
Post-Bid
Lancaster, PA 17602

LED Price Signs Fabrication & Installation-NJ, NY & PA
Renovation
Post-Bid

Shawmont Station Restoration - Electrical
Results
Philadelphia, PA

Security Vestibules for Commodore Perry Schools (Mechanical Construction)
Results
Hadley, PA 16430

Boiler Maintenance Contract
Alteration
Bidding
Blue Bell, PA 19422

Electrical Repair
Term Contract
Post-Bid
Pittsburgh, PA

Tyrone Area High School Loading Dock Renovations Project - Electrical Construction
Results
Less than $4,950 est. value
Tyrone, PA 16686

Library Natural Gas Boiler System
Post-Bid
Shamokin, PA

East Headworks - Electrical
Results
$5,698,000 est. value
Pittsburgh, PA

Uninterruptable Power Supply
Post-Bid
Philadelphia, PA

Additions and Renovations Project 1 to The Northeastern High School - Electrical Construction
Results
$3,171,064 est. value
Manchester, PA 17345

Auto Transfer Switch Generac Industrial Gaseous Generator
Post-Bid
Dallas, PA

Miscellaneous Buildings Renovations II Project - Group A Electrical Construction
Results
Reading, Scranton, PA 19602

Last Updated 07/04/2022 05:02 AM
Project Title

Water Treatment Plant Filter Improvements

Physical Address View project details and contacts
City, State (County) Adrian, PA 16210   (Armstrong County)
Category(s) Single Trades
Sub-Category(s) Electric, Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,115,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contract Number 22-2 - Mechanical - $800,000 Contract Number 22-3 - Electrical - $315,000 Contract Number 22-2 - Mechanical project consists of furnishing all labor, equipment and materials necessary to replace the filter media in the four water treatment plant filters and installation of filter air scour piping and air blowers. The work also includes spot repairs to the paint on the filters. Contract Number 22-3 - Electrical project consists of furnishing all labor, equipment and materials necessary to provide electric power and controls to the filter air scour piping valves and air blowers at the Water Treatment Plant. The work also includes upgrades to the SCADA System at the Water Treatment Plant

Details

Division 26 - Electrical.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents