Similar Projects
Flood Resiliency Improvements at Jones Island Water Reclamation Facility
Renovation, Infrastructure
Bidding
$600,000 CJ est. value
Milwaukee, WI 53204

Jones Island Water Reclamation Facility Building 225 PAC Cooling Pipe Repairs
Renovation
Sub-Bidding
$250,000 CJ est. value
Milwaukee, WI 53207

Plumbing Services
Term Contract
Sub-Bidding
Columbus, WI 53925

Private Lead Service Line Replacement
Post-Bid
Waterloo, WI 53594

Water Heater Replacements & Minor Plumbing
Term Contract
Post-Bid

Vehicle Wash Bay & Maintenance Bay Plumbing & Pavement
Results
Appleton, WI 54911

Elevator Replacement, Roger Harring Stadium -MEP
Results
$675,000 est. value
La Crosse, WI 54601

Steam and Condensate Repairs
Renovation
Construction
$169,500 CJ est. value
Waupun, WI 53963

Steam and Condensate Repairs
Renovation
Construction
$169,500 CJ est. value
Waupun, WI 53963

Insulation Maintenance and Installation Services
Term Contract
Post-Bid
Eau Claire, WI

Rotary Valve #6-2, #6-3, #7-1, #7-2 & #7-3 Replacements
Results
Milwaukee, WI 53207

Pipe Repair Clamps
Alteration
Post-Bid
Madison, WI

Utility Improvements - Phase 2 MEP
Results
$900,000 est. value
Union Grove, WI

Plumbing Services for all BTC Locations
Term Contract, Alteration
Post-Bid
Janesville, Milton, Monroe, WI 53546

Student Union Renovation - MEP
Results
$28,000,000 est. value
Milwaukee, WI 53211

Last Updated 09/23/2022 01:06 AM
Project Title

2022 Nuthatch Lane Utilities

Physical Address View project details and contacts
City, State (County) New Lisbon, WI 53950   (Juneau County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $57,177 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work for which bids are asked includes the following: Approximately 700 linear feet of 8-inch sanitary sewer, manholes, and laterals, 350 linear feet of water, services and appurtenances along with all turf restoration and erosion control for a complete project. The City has purchased most of the materials for the project including all pipe, fittings, manholes, valves, water and sanitary appurtenances. The work will only include installation of City purchased materials. The anticipated substantial completion date is December 31, 2022 and final completion date is May 15, 2023. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. BIDDER is required to deliver the original certified check or bid bond within the 72 hours of bid opening to MSA Professional Services, Inc., Attn: Brian Kehrli, 1230 South Boulevard, Baraboo, WI 53913. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. No bid may be withdrawn within 60 days after the actual date of the opening thereof. Pursuant to Section 66.0903, Wisconsin Statutes, the minimum wages to be paid on the project shall be in accordance with the wage rate scale established by local wage rates. OWNER reserves the right to waive any informalities or to reject any or all bids.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents