Similar Projects
West Point Warning System Upgrade
Alteration
Design
$1,700,000 est. value
WA

Advance Notice Fluke Hall Fire Alarm Upgrade
Renovation
Design
$500,000 CJ est. value
Seattle, WA 98105

Light Rail Vehicle Electronic Suite Upgrade
Term Contract, Infrastructure, Alteration
Post-Bid
Seattle, WA

Radio Testing Equipment for the Emergency Radio System
Term Contract, Alteration
Post-Bid
Seattle, WA

Public Schools Fire And Security System Maintenance Repair And Installation
Alteration
Results
Federal Way, WA

I-5, Jackson St and S Forest St VIC Fiber Repair
Alteration
Results
$200,000 to $300,000 est. value
WA

Nationwide Alarm Maintenance and Monitoring #3
Term Contract
Post-Bid

Terminal Park Elementary School Replacement Network Integration
Renovation
Results
$416,343 CJ est. value
Auburn, WA 98002

Sherwood Forest Elementary Safety and Security Updates
Renovation, Alteration - 62,638 SF
Post-Bid
$590,000 est. value
Bellevue, WA 98007

Nelson Middle School Phase 2 - Site and Security Improvements
Renovation
Results
$1,735,176 CJ est. value
Renton, WA 98055

ARPA Telecom and Network Cabling Work Order 2022-2024
Term Contract
Post-Bid
Seattle, WA

Dimmit Middle School Security Upgrades
Alteration
Post-Bid
$180,000 est. value
Seattle, WA 98178

D/B - Eastrail Fiber Development
Alteration
Post-Bid
$300,000 est. value
Seattle, WA

Public Safety and Security Services
Alteration
Post-Bid
Seattle, WA

Northlake House Fire Monitoring System Upgrade
Renovation
Post-Bid
$361,000 CJ est. value
Bothell, WA 98011

Last Updated 03/28/2023 11:05 AM
Project Title

Kennydale Elementary Security Enclosure

Physical Address View project details and contacts
City, State (County) Renton, WA 98056   (King County)
Category(s) Single Trades
Sub-Category(s) Security/Communications
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $340,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

For Kennydale Elementary Security Enclosure Bid Bond: This Project is estimated to cost $150,000.00 or more must be accompanied by a certified check, bank cashiers check, or bid bond, equal to 5% of the total Base Bid only, excluding taxes. Make checks payable to the Renton School District; furnish bond executed by a licensed bonding agency authorized to do business in the locality of the project. Prevailing Wage: It is the responsibility of the bidder to go online to the L&I web page electronically to verify they have the most current prevailing wages at time of bid Apprenticeship Requirement: This Project is not estimated to cost one million dollars or more. If selected, then this Project is subject to the apprenticeship requirements of ROW 39.04.320. Bidders may contact the Department of Labor & Industries, Apprenticeship Section, to obtain information on available apprenticeship programs. Bidders may contact the Department of Labor & Industries, Apprenticeship Section, to obtain information on available apprenticeship programs. Right to Reject: The Owner reserves the right to accept the lowest or any other Bid, the right to reject any or all Bids, and the right to waive any irregularities in any Bid. Withdraw of Bid: No Bid may be withdrawn, except with the express permission of the Owner, after the time set for the opening thereof, unless the award of Contract is delayed for a period exceeding 45 days. The Work includes, but is not limited to: Enclosure of front entry to form an entry vestibule with associated architectural, structural, electrical. and mechanical modifications A. The Owner has set the following indoor air quality goals for job site operations on the Project, within the limits of the construction schedule, contract sum, and available materials, equipment, products and services. Goals include the following. 1. Protect workers on the site from air quality problems during construction. 2. Prevent indoor air quality problems in the completed facility. B. Use safety meetings, signage, and subcontractor agreements to communicate the goals of the Construction Indoor Air Quality Management Plan. C. Conduct regular inspection and maintenance of Indoor Air Quality (IAQ) measures including ventilation system protection and ventilation rate

Details

Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents