Similar Projects
Take 5 Oil Change
New Construction - 1,100 SF
Design
$400,000 est. value
Forney, TX 75126

Walmart Supercenter #5389-251 - D80 BLST CHIL
Renovation - 208,418 SF
Design
Waco, TX 76643

CEFCO #1059
New Construction - 4,200 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Kemp, TX 75143

CHC Retail - Shell Building
New Construction - 15,000 SF
Post-Bid
$2,000,000 est. value
Forney, TX 75126

Dairy Queen
New Construction - 3,233 SF
Construction
$750,000 est. value
Forney, TX

Platinum Cadillac & Chevrolet
New Construction - 86,000 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Terrell, TX 75160

Fatburger Renovation / Crossroads at Terrell
Renovation - 2,150 SF
Pending Verification
$500,000 est. value
Terrell, TX 75160

Waffle House Project #72572 / Unit #1217
Build-out - 1,698 SF
Pending Verification
$150,000 CJ est. value
Terrell, TX 75160

Platinum Collision Center
Renovation - 1,252 SF
Design
$60,000 est. value
Forney, TX 75126

Walmart Supercenter #163-607 - CAPXHVAC-3
Renovation
Post-Bid
Nacogdoches, TX 75965

Tractor Supply
Renovation - 5,000 SF
Construction
$600,000 est. value
Terrell, TX 75160

Chick-fil-A - Mustang Crossing / Forney
Build-out - 4,651 SF
Pending Verification
$875,000 CJ est. value
Forney, TX 75126

Dutch Bros Coffee - Tx1804 / Terrell
New Construction
Design
$750,000 est. value
Terrell, TX 75160

Family Dollar / Kemp
Renovation - 10,500 SF
Post-Bid
$400,000 CJ est. value
Kemp, TX 75143

Texas Roadhouse
New Construction - 7,998 SF
Construction
$800,000 est. value
Terrell, TX 75160

Last Updated 05/10/2023 05:12 PM
Project Title

7-Eleven

Physical Address View project details and contacts
City, State (County) Forney, TX 75126   (Kaufman County)
Category(s) Commercial
Sub-Category(s) Food/Beverage Service, Gas Station, Retail, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Construction start expected October 2022 , Construction documents
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 12, 2022 the project is in Construction Documents. The Design-Build Firm is acting as the general contractor. Construction is expected to begin October 2022.

Details

1 Story Above Grade, 4,919 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment, Loading Dock Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Casework, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents