Similar Projects
New Drinking Water Well - City of Woodstock
New Construction, Infrastructure
Conception
$1,750,000 CJ est. value
Woodstock, IL 60098

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Design
$4,000,000 CJ est. value
Dixon, IL 61021

RFQ - Various Phase III Construction Inspection Projects, Various Routes, Various Counties
Term Contract
Design
Schaumburg, IL 60194

Cornell Development and Parking Lot Expansion
Infrastructure
Bidding
$2,225,000 CJ est. value
Huntley, IL 60142

Cornell Development and Parking Lot Expansion
Infrastructure
Bidding
$2,225,000 CJ est. value
Huntley, IL 60142

Rehabilitate Runway 8/26 Electrical
Infrastructure
Sub-Bidding
$600,000 CJ est. value
Lake in the Hills, IL 60156

Water Main Improvements
Infrastructure
Post-Bid

Phase III Construction Engineering Services for North Main Street Improvement
Infrastructure
Post-Bid
Crystal Lake, IL 60014

McCormick Park Area Water Main Replacement
Results
Crystal Lake, IL 60014

Harrison School 2021 Water Service Improvements
Infrastructure
Results
Wonder Lake, IL 60097

Three Oaks Recreation Area Pole Barn Cold Storage Building
New Construction, Infrastructure
Bidding
$372,000 CJ est. value
Crystal Lake, IL 60014

Adaptive Reuse of Property
Infrastructure
Post-Bid
Cary, IL 60013

Catch Basin and Valve Vault Repair & Replacement
Infrastructure
Results
Cary, IL

Fine Screen Removal System
Infrastructure
Post-Bid
$400,000 est. value
Cary, IL

2022 Lead Service Replacement Program
Infrastructure
Results
$200,000 est. value
Crystal Lake, IL

Last Updated 07/29/2022 12:02 PM
Project Title

Water Supply Well No. 6

Physical Address View project details and contacts
City, State (County) Fox River Grove, IL 60021   (McHenry County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed construction consists of a new 12-inch diameter water supply well finished in the Silurian Dolomite at a depth of approximately 175 feet; submersible pumping equipment, site piping, well abandonment, testing; and other miscellaneous items of work.Engineers Estimate is not available for this project.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents