Similar Projects
Camp Ripley Daikan Chiller Installation
Alteration
Bidding
Little Falls, MN 56345

John Marshall High School IAQ Improvements Bid Package 2
Alteration
Bidding
Rochester, MN 55901

MBC - Alerton Controls Services
Term Contract
Post-Bid
Minneapolis, MN

Filter Replacement Services at PHA Properties
Post-Bid
Saint Paul, MN

HVAC System Replacement
Results
Grand Rapids, MN 55744

HVAC Upgrades
Results
Minneapolis, MN 55411

Crossroads Mall Climate Controlled Storage
Renovation, Build-Out, Alteration - 10,600 SF
Pending Verification
Hastings, MN 55033

Madison ES HVAC Replacement and Deferred Maintenance Phase 3
Alteration
Bidding
Minneapolis, MN 55434

F108--Chemo Hood Vent Decontamination and Disposal St. Cloud
Post-Bid
Saint Cloud, MN

Crooked Lake ES HVAC Replacement and Deferred Maintenance Phase 2
Results
Andover, MN 55304

MNSU-22-FH-HVAC Upgrades
Alteration
Bidding
Mankato, MN 56001

HVAC and Mechanical Products
Term Contract
Post-Bid

Johnson High School HVAC Replacement
Results
Saint Paul, MN 55106

Construction Management as Advisor (CMa) Services for Mississippi Creative Arts - ARP HVAC Upgrades
Alteration
Bidding
Saint Paul, MN 55117

New Heights Elementary School, South Point Elementary School, Central Middle School - 2021 Improvements
Post-Bid
East Grand Forks, MN 56721

Last Updated 12/21/2021 01:19 PM
Project Title

Dorm Buildings HVAC Replacement at the Minnesota State Academy for the Blind

Physical Address View project details and contacts
City, State (County) Faribault, MN 55021   (Rice County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $840,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A. The work will done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1.) Replacement of existing air handling units and VAV boxes in three (3) existing dormitories along with associated electrical work.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents