Similar Projects
2022 Resurfacing of Various Streets
Infrastructure
Bidding
$2,000,000 est. value
Oak Park, IL

Resurface Washington Avenue
Infrastructure
Bidding
$4,000,000 est. value
Brookfield, IL 60513

2021 Purchase of Hot Mix Asphalt
Post-Bid
Des Plaines, IL

2021 Summer Paving
Post-Bid
Buffalo Grove, IL

I-19-4476 Roadway and Bridge Widening and Reconstruction
Results
$25,000,000 to $50,000,000 est. value
IL

Pavement Resurfacing
Results
Less than $2,760,387 est. value
Palatine, IL

Westview Center III Parking Improvement and Bell Tower Removal
Demolition, Alteration
Construction
Streamwood, IL 60107

Realignment of Shared-use Path, Pavement Reconstruction, and Retaining Wall
Infrastructure
Bidding
$4,000,000 est. value
Glencoe, IL

Greenwood Stormwater Basin
Post-Bid
Niles, IL 60714

2021 Street Program - Contract 1
Results
Less than $3,288,297 est. value
Schaumburg, IL

Green Alley Improvements - Phase 2 and 3
Infrastructure
Bidding
$500,000 est. value
River Forest, IL

2021 Pietrini School Traffic Flow Alteration
Post-Bid
Franklin Park, IL 60131

2.5 Miles of Resurfacing, Patching and ADA Improvements on IL 53 / Hicks Road from US 14 (Northwest Highway) to Lake-Cook Road, in the Village of Palatine
Results
IL

Fullerton Avenue Resurfacing
Infrastructure
Bidding
$425,000 est. value
Northlake, IL 60164

2021 MFT Street Reconstruction and Street Rehabilitation Program
Post-Bid
Arlington Heights, IL

Reported 06/15/2022 12:00 AM
Project Title

2021 Green Alley Program

Physical Address View project details and contacts
City, State (County) Summit, IL   (Cook County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $464,255 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Consists of concrete alley pavement, earth excavation, aggregate base course, sidewalk removal and replacement, driveway pavement removal and replacement, permeable paver installation, and all other appurtenant construction.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents