Similar Projects
Active Transportation Program (ATP) Cycle 5 - Vine Avenue/B Street Bike Boulevard - ST2302 - City of Ontario
Infrastructure
Conception
$4,311,000 CJ est. value
Ontario, CA 91762

Fourth Street Storm Drain - SM2301 - City of Ontario
Infrastructure
Conception
$2,075,158 CJ est. value
Ontario, CA 91762

Hopland Street Warehouses
New Construction, Infrastructure - 97,274 SF
Design
$11,000,000 CJ est. value
Adelanto, CA 92301

Grading, Paving and stripping for an Electric Truck Stop / San Bernardino
Infrastructure
Design
$750,000 CJ est. value
San Bernardino, CA 92408

Highland Community Park Perimeter Fence and Gates
Infrastructure
Bidding
$556,687 CJ est. value
Highland, CA 92346

Perimeter Fencing
Infrastructure
Bidding
$335,000 CJ est. value
San Bernardino, CA 92410

Cardinal CDC at San Bernardino High School SBHS
Renovation, Infrastructure - 15,000 SF
Sub-Bidding
$2,000,000 CJ est. value
San Bernardino, CA 92405

Sanitary Sewer, Storm Drain, Domestic Water and Recycled Water Improvements
Infrastructure
Sub-Bidding
$7,000,000 CJ est. value
Ontario, CA 91762

O'Reilly Auto Parts (CL2) / Colton
New Construction, Infrastructure - 7,453 SF
Post-Bid
$2,000,000 CJ est. value
Colton, CA 92324

Laurel Avenue at Randall Avenue
Alteration
Post-Bid
Fontana, CA 92331

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

CA FTNP MOJA 12(1) Cima Road Project
Infrastructure
Results
$27,227,000 CJ est. value
Cima, CA 92364

Central Avenue Warehouse
New Construction, Infrastructure - 54,330 SF
Pending Verification
$5,800,000 CJ est. value
Highland, CA 92346

Home2 Suites / Twentynine Palms
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Twentynine Palms, CA 92277

Alley Rehabilitation (Clean Local Grant) - SS23-002 - City of San Bernardino
Infrastructure
Conception
$722,772 CJ est. value
San Bernardino, CA 92401

Last Updated 02/13/2023 01:33 PM
Project Title

Install sewer pump station at the end of Juanita Street-City of Loma Linda

Physical Address View project details and contacts
City, State (County) Loma Linda, CA 92354   (San Bernardino County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Install sewer pump station at the end of Juanita Street This project is included in the City of Loma Linda's FY 2022-2023 CIP. As of February 13, 2023, information regarding a design team or a general contractor is not available. Funding is anticipated in 2023.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents