Similar Projects
248th Avenue - 95th Street to 103rd Street - SC190 - City of Naperville
Infrastructure, Renovation
Conception
$7,175,000 CJ est. value
Naperville, IL 60564

248th Avenue - 95th Street to 103rd Street - SC190 - City of Naperville
Infrastructure, Renovation
Conception
$7,175,000 CJ est. value
Naperville, IL 60564

Dog Haus Restaurant
New Construction, Infrastructure - 651 SF
Design
$250,000 CJ est. value
Bolingbrook, IL 60490

Wayfair Fulfillment Center - Airport Logistics Center 2 / Romeoville
New Construction, Infrastructure - 1,200,000 SF
Design
$129,600,000 CJ est. value
Plainfield, IL 60544

RFQ - Water Distribution System Rehabilitation Program - Construction Services
Term Contract
Bidding
Joliet, IL 60432

Asbestos Abatement at Victory Gymnasium - 25 N. Broadway Street
Term Contract, Infrastructure
Bidding
$174,000 CJ est. value
Joliet, IL 60435

Laraway Road Water Tower Reconditioning 2022
Infrastructure
Results
$1,765,712 est. value
Joliet, IL

Site Work
Infrastructure
Results
New Lenox, IL 60451

Robert C. Hill Elementary School Addition and Renovations - Bid Group No. 1 Packages #1 through #2
Addition, Demolition, Renovation, Infrastructure
Construction
$3,095,712 CJ est. value
Romeoville, IL 60446

The Belvedere
New Construction, Infrastructure
Construction
$80,000,000 CJ est. value
Naperville, IL 60564

Sparks Coffee
New Construction, Infrastructure - 945 SF
Pending Verification
$300,000 CJ est. value
Frankfort, IL 60423

Airport Industrial Addition
Addition, New Construction, Infrastructure - 7,321 SF
Pending Verification
$790,668 CJ est. value
Romeoville, IL 60446

Biosolids Holding Tank - Phase 2 - WW042 - City of Naperville
Infrastructure
Conception
$1,500,000 CJ est. value
Naperville, IL 60564

Willow Tree Farm Subdivision / Plainfield
New Construction, Infrastructure - 21,759 SF
Design
$42,652,136 CJ est. value
Plainfield, IL 60544

Playground Removal and Installation
Infrastructure
Bidding
$219,000 CJ est. value
Mokena, IL 60448

Last Updated 10/05/2023 11:10 AM
Project Title

Springbrook Water Reclamation Center Influent Pump Station and South Plant Force Main Improvements

Physical Address View project details and contacts
City, State (County) Naperville, IL 60564   (Will County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally includes demolition of existing equipment, replacement of damaged gate, replacement of stairway, replacement of gas detection equipment, replacement of influent pumps and associated electrical / power equipment, construction of emergency power connections and transformer, flow metering, yard piping, electrical, plumbing, structural and instrumentation and controls construction. Bidders must send a representative to attend the Pre-Bid meeting virtually. This is your only opportunity to speak directly with staff from the Water Utility Department regarding the project. QUESTIONS DURING THE BID PROCESS All questions concerning this bid shall be submitted in writing at least five business days prior to the online bid opening to Ryan La Russo at larussor@naperville.il.us. The deadline for questions is Friday, September 15, 2023 by 12:00 p.m. If required, a written response in the form of an Bid 23-192 3 of 4 SPRINGBROOK WATER RECLAMATION CENTER INFLUENT PUMP STATION AND SOUTH PLANT FORCE MAIN IMPROVEMENTS addendum will be issued. No contact with the Water Utility Department shall be made during the bid process. Questions asked after the deadline are not guaranteed a response.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents