Similar Projects
District Infrastructure for Reunion Filing 38
Infrastructure
Bidding
Commerce City, CO

Twin Lakes Aeration
Alteration
Bidding
CO

2020 Sacwsd Water System Removal and Replacements Phase 1
Post-Bid
Commerce City, CO

2020 SACWSD Water System Removal and Replacements Phase 2
Post-Bid
Commerce City, CO 80022

Water Softening Project 24 Inch Transmission Line
Results
Commerce City, CO

Baseline Waterline and North Tank Drainage Construction Project
Results
Brighton, CO

Buckley AFB, Co - Repair & Replace Fire Hydrants
Post-Bid
$1,000,000 to $5,000,000 est. value
Aurora, CO

Notice of Request for Contractor Qualifications
Term Contract
Results
Thornton, CO 80229

Vault and Valve Rehabilitation Program
Post-Bid
$190,000 to $200,000 est. value
Aurora, CO 80012

2020 Hydrant Preventive Maintenance
Results
Less than $75,000 est. value
Commerce City, CO 80022

General Pipeline Maintenance Services Standley Lake Pipeline
Post-Bid
Thornton, CO

60-Inch Gun Club Road Pipeline From East 6th Avenue to I-70
Results
$2,800,000 to $3,000,000 est. value
Aurora, CO 80012

Reservoir Above Water 72 Inch Vault and East Tee (Prime Contractors)
Post-Bid
Less than $2,000,000 est. value
Aurora, CO

Havana Street 30 Inch Water Line Renewal
Results
$2,250,000 to $3,000,000 est. value
Aurora, CO 80012

Aurora Reservoir Above Water 72-Inch Vault - 72" Valve
Post-Bid
Aurora, CO

Last Updated 07/19/2021 11:52 AM
Project Title

Repair of 12 Inch Waterline - Piney Creek Crossing at Saddle Rock GC-E Plymouth

Physical Address View project details and contacts
City, State (County) Aurora, CO   (Adams County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $370,000 to $440,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work to be performed under this contract will be the construction of approximately 570 feet of 12-inch diameter C900 PVC water pipeline, approximately 90 feet of 12-inch pressure pipe CIPP installation, and all pipeline appurtenances. This pipeline will replace the existing water main crossing of Piney Creek near the Saddle Rock Golf Course. The project consists of open-trench construction, horizontal directional drilling to cross Piney Creek, and a CIPP segment between homes to connect to the existing water main in E. Plymouth Circle.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents