Similar Projects
2022 Watermain Replacement - City of Lakewood
Infrastructure
Design
$6,750,000 est. value
Lakewood, OH

Harvard Denison 42 Inch Transmission Main Rehabilitation
Infrastructure
Bidding
$10,000,000 est. value
Cleveland, OH

Valves and Appurtenances
Infrastructure
Bidding
Cleveland, OH

Fire Hydrants and Fire Hydrant Parts
Infrastructure
Post-Bid
Cleveland, OH

Watermain Replacement, Resurfacing and Sims Park Walk Project
Infrastructure
Post-Bid
$850,000 est. value
Euclid, OH 44132

2020-C Water Main Renewal
Results
Less than $3,538,141 est. value
Cleveland, OH 44114

Leak Detection Phase II
Results
$640,750 est. value
Cleveland, OH

Vitrified Clay and PVC Pipe
Infrastructure
Post-Bid
Cleveland, OH

Shannon Road Resurfacing and Waterline Replacement
Results
Cleveland Heights, OH 44118

Broadway Avenue Watermain Replacement
Results
$1,501,604 est. value
Garfield Heights, OH 44105

2021 B Water Main Renewal
Results
Less than $2,091,300 est. value
Cleveland, OH

2021 C Water Main Renewal
Results
Less than $1,556,897 est. value
Cleveland, OH

2021 A Water Main Renewal
Results
$3,299,771 est. value
Cleveland, OH

Ellenwood Avenue Waterline Improvements
Results
Bedford, OH 44146

2021 Watermain Replacement Project
Results
$3,940,000 est. value
Cleveland, OH 44107

Last Updated 07/13/2022 12:17 PM
Project Title

2023 Watermain Replacement - City of Lakewood

Physical Address View project details and contacts
City, State (County) Lakewood, OH   (Cuyahoga County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Design Development, Construction Start Expected June 2023
Bids Due View project details and contacts
Estimated Value $6,345,500
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Lakewood, Ohio. Conceptual plans call for site work for a water / sewer project. A detailed scope has no been identified. This project is included in the city's FY 2022 2022 Comprehensive Budget Document. As of July 11, 2022, further details regarding design and construction timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents