Similar Projects
Sutton Place Townhomes
New Construction
Conception
Monroe, NC

Regent Pines
New Construction
Conception
$37,000,000 est. value
Monroe, NC

Waxhaw Landing
New Construction
Design
Monroe, NC 28112

Construction of a Roundabout
Infrastructure
Design
$1,026,396 CJ est. value
Weddington, NC 28173

Piedmont Innovation Park Sanitary Sewer
Infrastructure
Bidding
$3,500,000 CJ est. value
Monroe, NC 28112

Chestnut Parkway Phase 3
Infrastructure
Bidding
$1,900,000 CJ est. value
Indian Trail, NC 28104

RFQ Construction Manager at Risk - East Elementary School
New Construction, Infrastructure - 299,400 SF
Post-Bid
$70,000,000 CJ est. value
Monroe, NC 28112

Water Main Replacements - FY 22
Infrastructure
Post-Bid
$550,000 CJ est. value
Monroe, NC 28112

Morgan-Windsor Alley Improvements
Demolition
Results
Monroe, NC

Stack Road 8" Water Main Extension
Infrastructure
Results
$596,599 CJ est. value
Monroe, NC 28112

Broadmoor At Marvin
New Construction, Infrastructure
Construction
$20,000,000 CJ est. value
Waxhaw, NC 28173

Broadmoor At Marvin
New Construction, Infrastructure
Construction
$20,000,000 CJ est. value
Waxhaw, NC 28173

Cedar Meadows
New Construction
Pending Verification
Monroe, NC 28112

Orchard Creek
New Construction, Infrastructure
Pending Verification
$116,000,000 CJ est. value
Monroe, NC 28110

Bonds Grove Church/NC 16 Intersection - Town of Waxhaw
Infrastructure
Conception
$355,000 CJ est. value
Waxhaw, NC 28173

Last Updated 08/17/2023 09:32 AM
Project Title

Yardly at Monroe

Physical Address View project details and contacts
City, State (County) Monroe, NC 28110   (Union County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $50,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Christopher Todd Communities and Taylor Morrison ended their joint-venture agreement in November 2022. As of January 2023, permit applications have not been submitted to the City of Monroe or Union County and it is unclear whether or not the project will move forward.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents