Last Updated 09/22/2020 07:00 AM
Project Title

Water Plant No. 2 Rehabilitation

Physical Address View project details and contacts
City, State (County) TX   (Harris County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes but not limited to: Ground Storage Tank No. 1: Remove and install new self-supporting steel umbrella roof with roof vent, roof hatches, non-skid roof coating, roof handrail, interior access ladder and all appurtenances. Replace 10” overflow and drain with 16” overflow and drain. Install 16-inch surface water fill line, seal perimeter of ground storage tank joint to ringwall foundation. Power wash, abrasive blast, and recoat existing Ground Storage Tank No. 1 (55’ DIA X 24’ Height). Remove and install new cathodic protection. Ground Storage Tank No. 2: Remove and install new existing center roof vent, interior access ladder, roof hatches and the 6 screens from the existing perimeter roof vent openings. Install 16-inch surface water fill line, seal perimeter of ground storage tank joint to ringwall foundation. Power wash, abrasive blast, and recoat existing Ground Storage Tank No. 2 (55’ DIA X 24’ Height) and install non-skid roof coating with roof handrail. Remove and install new cathodic protection. Site Work: Power wash, abrasive blast, and recoat exterior wall surfaces of LAS building, generator enclosure and all above ground existing piping and associated appurtenances. Install Komax Triple Action Pipe Mixer to Well No. 1. Complete in place.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents