Similar Projects
Smart Building Management System Integration
Bidding
Colorado Springs, CO

Submit a Quote To Provide, Install, and Maintain a 10Gbe Over Otn (Otu-2) Service Between Bldg 4618, Room 300, 126 South Dagger Street, Cannon AFB, NM 88102 And Bldg 1551, Room DCO , 6151 Specker Avenue
Bidding
Fort Carson, CO - Cannon Air Force Base, NM 80913

Provide, Install, and Maintain A 2.5Gb Wave Service Between Bldg 1284, Room 188, 7100 Saber Road, Cheyenne, WY and Bldg 400, Room Mod 3, 400 O`Malley Ave, Schriever AFB, CO for 60 Months with No Basic Termination Liability (BTL)
Post-Bid
Colorado Springs, CO - Cheyenne, WY

Provide, Install, and Maintain 4 (Four) Commercial Business Line (CBL) Service at 3 KH at 455 E. Pikes Peak Ave., Colorado Springs, CO, 80903, US.
Post-Bid
Colorado Springs, CO 80903

C2 VTC Tier 3 Maintenance Service
Results
Colorado Springs, CO 80914

Cell Phone Detectors
Results
Colorado Springs, CO 80912

Provide, Install, and Maintain A 100 Mb Ethernet Circuit Between (Bldg) 2510 (Rm) Suit 130; (Fl) 1; 2510 Aviation Way; Colorado Springs, CO, 80916 (Mda Warehouse) and (Bldg) 400; (Rm) Mod 3/4; 400 O`M
Bidding
Colorado Springs, CO 80916

Evidence Facility Camera Upgrade - El Paso County Sheriff's Office
Post-Bid
Colorado Springs, CO 80900

Building Automation System (BAS) Installation & Maintenance Enterprise-wide Services
Results

Internal Connections Wired and Wireless Equipment
Post-Bid
Colorado Springs, CO 80921

Fiber Optic Cable along US-285
Results
$1,000,000 to $5,000,000 est. value

Internal Connections - Internal Wiring at 6 Schools
Post-Bid
Colorado Springs, CO

Security Cameras and Equipment
Results
Less than $275,457 est. value
Colorado Springs, CO 80910

County Project Security Cameras
Post-Bid
CO

Data and Power Cabling Inside Plant
Results
CO

Reported 07/02/2020 12:00 AM
Project Title

Operations (OPS) Floor Public Address (PA) System

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO 80914   (El Paso County)
Category(s) Single Trades
Sub-Category(s) Security/Communications
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Equipment List & Floor Plan Amplifier supporting at least 5 microphone inputs, auxiliary input, zone-based outputs for 12speakers and an auxiliary output that will be used to interface with VOIP and VOCIP phones. Equipment rack 12 speakers (ceiling mounted) Zone-based volume control Five SM-58 microphones, each with 15’ cable and built-in on/off switch Five female microphone outlets/plug-ins Three portable microphone stands (for SM-58 microphones) Device allowing switchable 2-way connection between unclassified VOIP phone and PA system Device allowing switchable 2-way connection between classified VOCIP phone and PA system Cables, switches and connectors Specific Requirements List: The installed system shall not include any Bluetooth devices, wireless devices, or network connections. The amplifier and related equipment will be located on an equipment rack near the southeast corner of the OPS floor area. Zone-based volume controls and VOIP/VOCIP controls shall be installed on vertical column near OPS crew workstations (refer to attachment 1). Speakers shall be installed in ceiling providing adequate zone-based coverage of entire room. Microphone outlets/plug-ins shall be installed at approximate locations shown on attachment 1. All microphones shall include an on/off switch built into the microphone. The system shall include controls/device(s)/connections allowing switchable 2-way integration with unclassified VOIP phones and PA system. The system shall include controls/device(s)/connections allowing switchable 2-way integration with classified VOCIP phones and PA system. Contractor will provide all required cables, switches and connectors. INSPECTION: A pre-installation inspection shall be conducted. The inspection participants will be the Contractor, Contracting Officer, and the Project Manager. All project spaces will be inspected for damage. The Phasing Plan will be discussed to verify sequencing and coordination issues. INSTALLATION and INSPECTION: All equipment will be installed, connected, tested and demonstrated to be fully operational upon completion. All affected areas of concern shall be cleaned, dusted, and all debris will be removed from PAFB. All damaged and/or deficient items shall be inspected by the Contractor and the Government together for disposition. All warranty issues shall be annotated and corrected. A single punch list will be compiled and submitted to all involved parties.

Details

Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents