Similar Projects
OR DOT 140(1), Klamath County Boat Marina to Lakeshore Drive
Infrastructure, Alteration
Design
$20,000,000 est. value
Klamath Falls, OR 97601

Application of Longitudinal Pavement Markings
Infrastructure
Bidding
$50,000 to $100,000 est. value
Newport, OR

ADA Ramps 2020 - Fischer & Roshak - Multiple Locations
Alteration
Post-Bid
$1,000,000 to $1,500,000 est. value
OR

Upgrade Traffic Signals and Install Ramps
Alteration
Post-Bid
$770,000 est. value
Portland, OR

US101: Bunker Hill Sidewalks and Flanagan Signal Project on the Oregon Coast Highway
Infrastructure
Results
OR

OR62 - Rogue Valley Expressway Project Crater Lake Tim Fletcher, Pm
Infrastructure
Results
$1,000,000 to $2,000,000 est. value
Medford, OR

Wilson Avenue Corridor Project - Construction Manager/General Contractor
Infrastructure, Alteration
Post-Bid
Bend, OR

Region 2 Signal Improvements Area 1 and 3 (Const) Project Various Highways
Infrastructure
Results
$500,000 to $1,000,000 est. value

East Systemic Signals and Illumination
Infrastructure
Post-Bid
$2,000,000 to $5,000,000 est. value
Canby, Happy Valley, Milwaukie, Oregon City, Sandy, OR

Albany and Corvallis Signal Improvements
Infrastructure
Results
$1,000,000 to $2,000,000 est. value

Traffic Paint
Alteration
Post-Bid
$350,000 est. value
OR

Curve Warning Upgrades
Infrastructure
Results
$1,000,000 to $2,000,000 est. value

Runway 8/26 Reconstruction
Alteration
Post-Bid
$8,500,000 est. value
Klamath Falls, OR

ADA Ramps - W Baseline Road
Alteration
Results
$300,000 to $400,000 est. value
OR

Windy Creek Bridge Replacement Reuben Road
New Construction, Infrastructure
Post-Bid
$2,100,000 est. value
Glendale, Roseburg, OR 97442

Reported 04/15/2022 12:00 AM
Project Title

Pavement Management Program Preventative Maintenance

Physical Address View project details and contacts
City, State (County) Tigard, OR   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers, Traffic Signalization
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $566,800 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project generally consists of the following: 1. Temporary traffic control and temporary erosion control. 2. Application of slurry seal on residential streets. 3. Removal and application of pavement striping and markings on residential streets. 4. Performance of additional and incidental work as called for by the specifications and plans.

Details

Division 10 - Specialties, Signage.
Division 32 - Exterior Improvements, Paving Specialties, Pavement Markings.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents