Similar Projects
Commercial Building
New Construction, Renovation - 7,153 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Wilmington, NC

Site Work and Renovations for the Pitt County Animal Shelter
Renovation
Bidding
Greenville, NC 27858

ECMHSP Migrant Head Start Center
New Construction
Post-Bid
NC 28457

Highway Enhancement/Litter Pickup 2019-2020
Post-Bid

Rockingham Housing Authority (RHA) Site Improvements Project
Results
Less than $400,773 est. value
Rockingham, NC 28379

Goldmine Convenience Center
Results
Less than $148,995 est. value
Monroe, NC 28110

Eagles Store and Car Wash
New Construction - 5,705 SF
Construction
$2,510,000 est. value
Pittsboro, NC

Transportation Impact Phase 2
Addition, Demolition - 12,112 SF
Construction
Emerald Isle, NC 28594

Industrial Airpark Construction - Site Preparation
Post-Bid
Kenansville, NC

Reefer and Container Yard Redevelopment - 2019
Results
$16,000,000 to $22,000,000 est. value
Wilmington, NC

CIHA Phase II
New Construction
Construction
Cherokee, NC 28719

Chatham Park Utilities Project 1
New Construction
Post-Bid
$750,000 est. value
Pittsboro, NC

Airport Monumental Entrance
Results
Charlotte, NC

Coastal Walk Marketplace
New Construction - 103,500 SF
Construction
$10,000,000 CJ est. value
Shallotte, NC 28470

Chatham Park Utilities Project 2
New Construction
Post-Bid
$750,000 est. value
Pittsboro, NC

Last Updated 02/06/2020 04:38 PM
Project Title

NASCAR Site - Corporate Hangar Site Development

Physical Address View project details and contacts
City, State (County) Charlotte, NC   (Mecklenburg County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes an approximately 7300 square yard taxiway expansion, relocation of an access road serving the existing Bank of America hangars, and construction of associated storm-water best management practices and utilities to serve two future hangars in the project area. Construction activities will include demolition of an existing parking lot and access road, construction of an approximately 730 lineal feet access drive off Airport Drive, modification of an existing regional dry detention pond, relocation of underground wet and dry utilities, and installation of a new sand filter to serve the proposed development. The site will be mass graded and retaining walls will be installed to accommodate future build out. The project will be phased with the intent of maintaining access and utility service to the existing hangars in the project vicinity throughout construction.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Airfield Signaling and Control Equipment.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents