Similar Projects
Road Improvement Project on Rock Hall Road, Fritz Road and Parking Lot of Town Hall - Town of Colebrook
Infrastructure
Conception
$470,824 CJ est. value
Colebrook, CT 06021

Road Improvement Project on Rock Hall Road, Fritz Road and Parking Lot of Town Hall - Town of Colebrook
Infrastructure
Conception
$470,824 CJ est. value
Colebrook, CT 06021

Cornwall Hollow Road Office Redevelopment
Addition, Demolition, Infrastructure
Design
West Cornwall, CT 06796

Wykeham Rise
New Construction, Infrastructure
Design
$100,000,000 CJ est. value
Washington Depot, CT 06793

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFQ Contractor - Gate Cylider Repairs at Black Rock Lake
Infrastructure
Bidding
$500,000 CJ est. value
Thomaston, CT 06787

Winter Maintenance, Rock House Road 2021-2022 Winter Season
Term Contract
Post-Bid
Goshen, CT

Snow Plowing, Salting and Sanding
Term Contract
Post-Bid
Watertown, CT

New Preston Center Sidewalks
Infrastructure
Results
$90,000 to $120,000 est. value
Washington, CT 06794

Prospect Street Rehabilitation and Improvements
Infrastructure
Results
Torrington, CT 06790

Camp Dutton Road Drainage
Infrastructure
Construction
$400,000 CJ est. value
Litchfield, CT 06759

Sam's Mart Service Station
Addition, New Construction, Infrastructure, Renovation - 2,612 SF
Pending Verification
$200,000 CJ est. value
Torrington, CT 06790

Sam's Mart Service Station
Addition, New Construction, Infrastructure, Renovation - 2,612 SF
Pending Verification
$200,000 CJ est. value
Torrington, CT 06790

Water Lines Extension - Town of Barkhamsted
Infrastructure
Conception
$417,305 CJ est. value
Barkhamsted, CT 06063

Keystone Place at Newbury Brook
Addition, Demolition, Infrastructure - 25,525 SF
Design
$6,800,000 CJ est. value
Torrington, CT 06790

Last Updated 12/01/2022 06:04 PM
Project Title

Route 202 - (East Main Street) Sidewalk Project - Phase 1

Physical Address View project details and contacts
City, State (County) Torrington, CT 06790   (Litchfield County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $768,626 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project work is comprised of furnishing all equipment, labor, material, plant, and superintendence to perform all work necessary for the construction of new concrete sidewalks and curbing including, driveway aprons, catch basin tops, traffic signal modifications and associated miscellaneous work. A bid bond, in an amount not less than five percent (5%) of the amount of the bid shall accompany each bid with a performance bond and a labor & materials bond. A non-collusion statement for Prime Contractors and any addendum acknowledgement must also be submitted at the time of the bid. The City of Torrington reserves the right to accept or reject any or all bids, to waive technicalities, or to award the contract to a bidder other than the lowest bid, and to award the contract as it feels will best serve the public interest. The contractor who is selected to perform this State project must comply with CONN. GEN. STAT. 4a-60, 4a-60a, 4a-60g, and 46a-68b through 46a-68f, inclusive, as amended by June 2015 Special Session Public Act 15-5. State law requires a minimum of twenty-five (25%) percent of the state-funded portion of the contract for award to subcontractors holding current certification from the Connecticut Department of Administrative Services under the provisions of CONN. GEN STAT. 4a-60g, as amended. (25% of the work with DAS certified Small and Minority owned businesses and 25% of that work with DAS certified Minority, Women and/or Disabled owned businesses.) The contractor must demonstrate good faith effort to meet the 25% set-aside goals. For municipal public works contracts and quasi-public agency projects, the contractor must file a written or electronic non-discrimination certification with the Commission on Human Rights and Opportunities. All bids will be considered valid for a period of sixty (60) days. Question Deadline 09/02/2022 at 12:55 PM ET All questions shall be submitted in writing.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents